Skip to main content

Vietnam city roads development

New road building work for two key links in Ho Chi Minh City in Vietnam is expected to cost US$124 million. Truong Chinh street and Tan Ky Tan Quy street will be widened to boost capacity and cut congestion. The former will feature five to six lanes in either direction once the work is complete. The latter will feature three lanes in either direction once the work is complete. Considerable site clearance work will have to be carried out for the work to go ahead.
August 27, 2019 Read time: 1 min

New road building work for two key links in Ho Chi Minh City in Vietnam is expected to cost US$124 million. Truong Chinh street and Tan Ky Tan Quy street will be widened to boost capacity and cut congestion. The former will feature five to six lanes in either direction once the work is complete. The latter will feature three lanes in either direction once the work is complete. Considerable site clearance work will have to be carried out for the work to go ahead.

Related Content

  • Vietnam highway upgrade improving connection with Cambodia
    April 12, 2017
    A highway upgrade in Vietnam will help improve links with neighbouring Cambodia. Work is needed to upgrade the 80km stretch of highway, despite improvements carried out 10 years ago. The route links Ho Chi Minh City with the Cambodian border and is important for trade and transport between the two nations. National Highway 22B is located in of Vietnam’s southeastern province Tay Ninh in Vietnam. The work is expected to cost US$13.23 million and will be carried out in several phases. Work on the first stage
  • Work starts on Hang Ngoai Bridge project
    September 7, 2020
    Vietnam’s Ho Chi Minh City is widening the bridge to 22.5m.
  • Vietnam’s massive transport infrastructure development
    March 13, 2025
    Vietnam has a massive programme of transport infrastructure development.
  • New transport links for Vietnam’s key cities
    May 31, 2019
    Both Ho Chi Minh City (HCMC) and Hanoi in Vietnam are to benefit from new transport infrastructure. For HCMC, as much as $39.6 billion will be required to deliver all of the 85 transport infrastructure projects being planned. Severe congestion and flooding are frequent problems causing major traffic hold-ups. Of the 85 transport projects needed for the city, 15 are for the construction of new roads while 55 are for road/bridge works. A further eight are for rail links and seven for waterways. Meanwhile in