Skip to main content

Video: North Tyneside’s triple decker Silverlink on schedule

Highways England reports that the Silverlink triple-deck roundabout in North Tyneside is 80% complete and on schedule for opening in March next year. The €83 million project involves lowering the A19 highway underneath the Silverlink roundabout and A1058 Coast Road. The new road is expected to be used by 35,400 vehicles daily. “We are now entering the final stages,” said Steven Cox, Highways England assistant project manager. “Work to remove the 80,000m³ of soil has now been completed [and] we have six m
August 29, 2018 Read time: 2 mins
Down she goes: the A19 highway is now underneath the Silverlink roundabout and A1058 Coast Road

8100 Highways England reports that the Silverlink triple-deck roundabout in North Tyneside is 80% complete and on schedule for opening in March next year.

The €83 million project involves lowering the A19 highway underneath the Silverlink roundabout and A1058 Coast Road. The new road is expected to be used by 35,400 vehicles daily.

“We are now entering the final stages,” said Steven Cox, Highways England assistant project manager.

“Work to remove the 80,000m³ of soil has now been completed [and] we have six months left on site. We still have some important work to complete such as the drainage, the pedestrian and cycle bridges and resurfacing the entire junction but providing the winter is kind to us we should be on track.”
 
Since work started in June 2016, 55 bridge beams, each weighing 35 tonnes and 22m long, have been transported from Ireland, three bridges have been constructed for the existing layout, and  have been used and 3.2km of drainage has been created.

Improvements to the 1.2km of cycleway have been carried out as well as adding another 247m.

A time capsule in which local businesses and schools have contributed items has been buried on site and will be unearthed in 100 years, explained Norma Redfearn, the new mayor of North Tyneside.

Highways England is the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

For more information on companies in this article

Related Content

  • Automated testing is safer, cheaper and more thorough
    December 12, 2018
    Automated testing is improving safety during paving and saving on testing costs. But it could also help reduce long-term maintenance costs too - Kristina Smith writes Testing pavements as they are laid can be a hazardous activity. The technician may be on their hands and knees, far behind the main gang, or reaching inside the hopper to measure the temperature of the hot mix or dodging rollers to take density readings.
  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Help is on the way: RoadResource.org
    November 29, 2018
    RoadResource.org as a go-to website for surfacing information is now live, explains Doug Hogue, of VSS Macropaver When RoadResouce.org went live – quietly - in July it was the end of two years of hard work by three US associations for pavement preservation. But there was no grand party or ceremonial pushing of the “go live” button, says Doug Hogue, vice president and general manager of VSS Macropaver. “For all of us in the industry July is a busy period that left little time to celebrate on the ope