Skip to main content

Video: North Tyneside’s triple decker Silverlink on schedule

Highways England reports that the Silverlink triple-deck roundabout in North Tyneside is 80% complete and on schedule for opening in March next year. The €83 million project involves lowering the A19 highway underneath the Silverlink roundabout and A1058 Coast Road. The new road is expected to be used by 35,400 vehicles daily. “We are now entering the final stages,” said Steven Cox, Highways England assistant project manager. “Work to remove the 80,000m³ of soil has now been completed [and] we have six m
August 29, 2018 Read time: 2 mins
Down she goes: the A19 highway is now underneath the Silverlink roundabout and A1058 Coast Road

8100 Highways England reports that the Silverlink triple-deck roundabout in North Tyneside is 80% complete and on schedule for opening in March next year.

The €83 million project involves lowering the A19 highway underneath the Silverlink roundabout and A1058 Coast Road. The new road is expected to be used by 35,400 vehicles daily.

“We are now entering the final stages,” said Steven Cox, Highways England assistant project manager.

“Work to remove the 80,000m³ of soil has now been completed [and] we have six months left on site. We still have some important work to complete such as the drainage, the pedestrian and cycle bridges and resurfacing the entire junction but providing the winter is kind to us we should be on track.”
 
Since work started in June 2016, 55 bridge beams, each weighing 35 tonnes and 22m long, have been transported from Ireland, three bridges have been constructed for the existing layout, and  have been used and 3.2km of drainage has been created.

Improvements to the 1.2km of cycleway have been carried out as well as adding another 247m.

A time capsule in which local businesses and schools have contributed items has been buried on site and will be unearthed in 100 years, explained Norma Redfearn, the new mayor of North Tyneside.

Highways England is the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

For more information on companies in this article

Related Content

  • A serious side to England’s funny funnel bins
    December 14, 2017
    The UK and Australia are trying to reduce litter on motorways and free up maintenance teams to pursue more urgent – and less dangerous - work Giant funnel bins are being installed at a dozen UK motorway service areas in north-west England. The bins, either 1.8m or 2.2m high, are next to Give Way lines at the exit of service area car parks. The bins allow both car and truck drivers to reach the half-metre-wide funnels from their vehicle window. Highways England is hoping that the bins’ ease of use will en
  • Shay Murtagh Precast bridges gap at Whitley Junction in Coventry
    May 22, 2018
    Shay Murtagh Precast has been supplying main contractor Costain with all precast units for the Whitley Junction Improvement works in Coventry, England. Costain was contracted by Coventry City Council to remodel the junction on the A444, one of the busiest routes in the city. Shay Murtagh Precast manufactured and delivered 30 Y5 beams, 4 YE5 beams, 2 cast on parapets as well as 750 Hexlok Panels with feature finish for the reinforced soil walls and abutments. Shay Murtagh Precast manufactured 22 bridge be
  • Plantworx show organisers bullish
    December 11, 2018
    The organisers of the Plantworx 2019 construction machinery exhibition are bullish, having now sold 75% of the show space available. The 2019 event is taking place at its new East of England Arena home in Peterborough. This has 20% more exhibition space than the 2017 event. The digging demonstration areas are 97% sold out – with only two stands remaining. Angela Spink, Plantworx sales manager said, “We are delighted with the response we have had from companies wanting to book their stand space at the show
  • Terex Finlay 883+ triple shaft screen to launch Q3 2018
    April 24, 2018
    Terex Finlay’s 883+ triple shaft heavy duty screen is due to go into full production in September 2018. The latest addition to the Northern Ireland-headquartered manufacturer’s 8-Series line up, the 883+ triple shaft model is said to be ideal for a variety of dry and difficult sticky applications including quarry, mining, sand and gravel, construction and demolition debris and recycling applications. The heart of the 883+ triple shaft is the new triple shaft screenbox, featuring two full size 16’ x 5’ sc