Skip to main content

Video: North Tyneside’s triple decker Silverlink on schedule

Highways England reports that the Silverlink triple-deck roundabout in North Tyneside is 80% complete and on schedule for opening in March next year. The €83 million project involves lowering the A19 highway underneath the Silverlink roundabout and A1058 Coast Road. The new road is expected to be used by 35,400 vehicles daily. “We are now entering the final stages,” said Steven Cox, Highways England assistant project manager. “Work to remove the 80,000m³ of soil has now been completed [and] we have six m
August 29, 2018 Read time: 2 mins
Down she goes: the A19 highway is now underneath the Silverlink roundabout and A1058 Coast Road

8100 Highways England reports that the Silverlink triple-deck roundabout in North Tyneside is 80% complete and on schedule for opening in March next year.

The €83 million project involves lowering the A19 highway underneath the Silverlink roundabout and A1058 Coast Road. The new road is expected to be used by 35,400 vehicles daily.

“We are now entering the final stages,” said Steven Cox, Highways England assistant project manager.

“Work to remove the 80,000m³ of soil has now been completed [and] we have six months left on site. We still have some important work to complete such as the drainage, the pedestrian and cycle bridges and resurfacing the entire junction but providing the winter is kind to us we should be on track.”
 
Since work started in June 2016, 55 bridge beams, each weighing 35 tonnes and 22m long, have been transported from Ireland, three bridges have been constructed for the existing layout, and  have been used and 3.2km of drainage has been created.

Improvements to the 1.2km of cycleway have been carried out as well as adding another 247m.

A time capsule in which local businesses and schools have contributed items has been buried on site and will be unearthed in 100 years, explained Norma Redfearn, the new mayor of North Tyneside.

Highways England is the government-owned company responsible for modernising, maintaining and operating England’s motorways and major A roads.

For more information on companies in this article

Related Content

  • UK government pledges pothole pounds
    April 9, 2018
    The UK government will hand out to a number of councils in England extra money for pothole repairs, said Chris Grayling, transport secretary. Around €125 million will be shared out, with the south-west county of Devon getting the lion’s share – nearly €5.2 million. The funding is in addition to €86 million Pothole Action Fund and the almost €7 billion set aside for improving local roads across the entire UK.
  • Causeway and immersed road for LagoonHull
    December 1, 2021
    The agency proposing the UK’s LagoonHull project says it’s development and construction costs could be between €1.2-2.4 billion.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Morocco's road programme boosts economy
    February 9, 2012
    A major road programme instigated by King Mohammed VI of Morocco is helping to boost the country's economy and modernise infrastructure. This forms part of a plan to boost tourism, a key part of the country's income from 8 - 10 million. There were less than 300km of motorways existing when King Mohammed VI inherited the throne from his father in July 1999. Since then, the figure has increased to over 1,000km and this is set to almost double in the next five years. A hugely significant highway programme was