Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Soilmec unleashes new generation of drilling rigs
    January 6, 2017
    Bauma will be the platform for Soilmec’s next generation of hydraulic drilling rigs for large diameter piles and smaller drilling rigs for micropiles and anchoring. The new rigs have been designed by the ground engineering specialist to improve productivity and operating flexibility and are installed with tier 3 and 4 diesel engines. Powerful and lightweight rotaries have allowed torque levels to increase by up to 20% and the units use high-strength steels. To further improve safety and efficiency, they als
  • Soilmec unleashes new generation of drilling rigs
    February 26, 2013
    Bauma will be the platform for Soilmec’s next generation of hydraulic drilling rigs for large diameter piles and smaller drilling rigs for micropiles and anchoring. The new rigs have been designed by the ground engineering specialist to improve productivity and operating flexibility and are installed with tier 3 and 4 diesel engines. Powerful and lightweight rotaries have allowed torque levels to increase by up to 20% and the units use high-strength steels. To further improve safety and efficiency, they als
  • Major Wire to showcase Flex-Mat 3 screen technology
    January 31, 2013
    Major Wire Industries’ innovative Flex-Mat 3 vibrating wire technology for screening will be on show. The Montreal, Canada-based company, sharing its stand with Haver & Boecker, its European sales representative, offers its Flex-Mat 3 high-performance, self-cleaning screen media, which it claims helps screening operations increase screen capacity and material throughput while reducing downtime. Available for tensioned or modular screen decks, Flex-Mat 3 panels (now in its third generation since its introduc
  • JCB emissions compliant engines to launch in wheeled loaders
    January 6, 2017
    JCB will launch 427 and 437 wheeled loaders at Bauma, powered by Stage IIIB/Tier 4 Interim Cummins engines. First seen in prototype form at last year’s Intermat show, the two loaders are powered by the Cummins QSB6.7 engine, which offers a 9.4% increase in torque over the previous model. This drives through a lock-up converter and customers can choose a standard four-speed or optional five-speed transmission, which delivers a 16% drop in fuel consumption. In-cab noise levels have been reduced to just 68dB(A