Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • JCB is offering a new range of its JS crawler excavators
    January 6, 2017
    The new generation JS crawler excavators from JCB are said to deliver increased performance along with reduced running costs. The JS220, JS260 and JS360 are all powered by Isuzu diesels that meet the Tier 4 Interim/Stage IIIB emissions requirements with reduced fuel consumption and increased torque rise. For developing markets, there is also a Tier 2 compliant version of the JS220 powered by a JCB 448 Dieselmax engine with a similar output to the 129kW Isuzu diesel in the Tier 4 Interim/Stage IIIB model. Th
  • JCB is offering a new range of its JS crawler excavators
    April 11, 2012
    The new generation JS crawler excavators from JCB are said to deliver increased performance along with reduced running costs. The JS220, JS260 and JS360 are all powered by Isuzu diesels that meet the Tier 4 Interim/Stage IIIB emissions requirements with reduced fuel consumption and increased torque rise. For developing markets, there is also a Tier 2 compliant version of the JS220 powered by a JCB 448 Dieselmax engine with a similar output to the 129kW Isuzu diesel in the Tier 4 Interim/Stage IIIB model. Th
  • Lintec showcases redesigned CSD 1500 plant at bauma
    February 12, 2013
    Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
  • Topcon launches new subscription based web services
    August 17, 2012
    Topcon has restructured its GNSS network business and global GNSS services, offering new and informative web resources for users. TopNET is said to offer subscription based, real-time GNSS network RTK and DGNSS subscriptions, with high quality GPS and GLONASS correction data, as well as all future GNSS signals, for many different applications; including surveying, construction, GIS mapping, machine control, and precision agriculture.