Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Underground excavators are offered by Hidromek
    January 6, 2017
    A special version of Hidromek’s HMK220LC excavator is now available for use in underground applications. This machine features additional reinforcement and protection to ensure its longevity in the tough underground application, as well as providing extra safety measures for the operator. The same Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used as in the standard machines, although additional after-treatment systems are available to meet underground working requirement
  • Underground excavators are offered by Hidromek
    February 6, 2013
    A special version of Hidromek’s HMK220LC excavator is now available for use in underground applications. This machine features additional reinforcement and protection to ensure its longevity in the tough underground application, as well as providing extra safety measures for the operator. The same Tier 4 Interim/Stage IIIB emission certified engine and hydraulics components are used as in the standard machines, although additional after-treatment systems are available to meet underground working requirement
  • CDE’s new German focus
    January 6, 2017
    CDE Global has formed CDE GmbH trading as CDE Deutschland, which has developed from a distribution agreement for southern Germany that was in place between CDE Global and Jurgen Kolsch. The move sees Stefan Kolsch and Sean McCusker assume roles as directors in the new company, which will have exclusive responsibility for the sales, distribution, project management and after sales and service elements of the CDE business in Germany.
  • CDE’s new German focus
    February 13, 2013
    CDE Global has formed CDE GmbH trading as CDE Deutschland, which has developed from a distribution agreement for southern Germany that was in place between CDE Global and Jurgen Kolsch. The move sees Stefan Kolsch and Sean McCusker assume roles as directors in the new company, which will have exclusive responsibility for the sales, distribution, project management and after sales and service elements of the CDE business in Germany.