Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Terex Finlay puts new I-100RS mobile impact crusher on bauma stage
    March 19, 2013
    The new Terex Finlay I-100RS mobile impact crusher and the Terex Finlay J-1170 jaw crusher will be showcased at bauma as part of the Terex Materials Processing exhibit. Claimed by Terex Finlay to be a compact and aggressive tracked primary jaw crusher, the J-1170 is said to have a robust hydrostatically driven Terex jaw chamber which provides high capacity with large reduction ratios. The jaw chamber configuration can be set up specifically for either processing construction demolition debris or quarrying a
  • ContiTech Conveyor Belt Group showcases MegaPipes solution
    February 26, 2013
    The ContiTech Conveyor Belt Group’s “innovative and environmentally friendly” conveyor belt solutions include the new MegaPipes. With an external diameter of up to 900mm, ContiTech claims the product doubles the capacities compared to conventional closed-trough belts and enables the transport of crushed ore downstream of the primary crusher or of bulky goods in the industrial sector applications.
  • Sandvik adds to DC hammer drill line
    January 6, 2017
    Sandvik Construction has added the DC125R to its DC family of compact top hammer drill rigs. The remote-controlled self-propelled rig has a four-wheeled carrier that can also be equipped with rubber tracks for added mobility in difficult terrain. Capable of drilling 22-45mm diameter holes, the machine is capable of up to 300-400m3 in an eight-hour shift. The 3,150kg mini rig is powered by a 37kW engine that drives a 5.5kW rock drill. Designed primarily for foundation drilling, road cutting, trenching, line
  • Sandvik adds to DC hammer drill line
    April 16, 2013
    Sandvik Construction has added the DC125R to its DC family of compact top hammer drill rigs. The remote-controlled self-propelled rig has a four-wheeled carrier that can also be equipped with rubber tracks for added mobility in difficult terrain. Capable of drilling 22-45mm diameter holes, the machine is capable of up to 300-400m3 in an eight-hour shift. The 3,150kg mini rig is powered by a 37kW engine that drives a 5.5kW rock drill. Designed primarily for foundation drilling, road cutting, trenching, line