Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • IronPlanet shows its latest features at INTERMAT 2012
    January 6, 2017
    The IronPlanet online marketplace for used heavy equipment will be updating INTERMAT visitors about its latest developments, including a smartphone application that allows users to search and bid wherever they are.
  • IronPlanet shows its latest features at INTERMAT 2012
    February 6, 2012
    The IronPlanet online marketplace for used heavy equipment will be updating INTERMAT visitors about its latest developments, including a smartphone application that allows users to search and bid wherever they are.
  • Simem brings concrete batching plant to bauma
    January 6, 2017
    Focal point of Simem’s stand at bauma was an example of its Eagle portable concrete batching plant, which is said to offer top performance at lower cost without compromising the firm’s emphasis on quality. Modular elements with pre-installed pneumatic-electric systems are the key to enabling swift transfer of the Eagle plant from one project to the other. The ‘super-mobile’ MMX range of plant from Simem – said to be the best solution available for faster moving sites such as railways and highways – was also
  • Simem brings concrete batching plant to bauma
    April 22, 2013
    Focal point of Simem’s stand at bauma was an example of its Eagle portable concrete batching plant, which is said to offer top performance at lower cost without compromising the firm’s emphasis on quality. Modular elements with pre-installed pneumatic-electric systems are the key to enabling swift transfer of the Eagle plant from one project to the other. The ‘super-mobile’ MMX range of plant from Simem – said to be the best solution available for faster moving sites such as railways and highways – was also