Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • India - road safety research
    July 4, 2016
    A new publication compiling research on road safety in India has now been compiled. This has been produced by an expert in the field, NS Srinivasan. The book is called, “Planning for the future – Solutions for India’s traffic problems” This publication contains 30 articles published during the past few years on the topic. This book is incorporated in the website and is available for the benefit of technical community. Other books included in the website are: “Taking the high road – Research on transport
  • Sandvik Construction’s new CH550 cone crusher
    February 5, 2013
    Sandvik Construction says its new generation of compact cone crusher provides customers with optimum performance and good cubical shape, while ensuring low operating costs per tonne for a wide range of materials and applications. The all-new patented 18.9tonne Sandvik CH550, is based on the proven HYDROCONE design, with the CH550 combining the ability to produce excellent shaped products, in fewer crushing stages.”
  • VIDEO: Brazilian cyclists caught on camera drafting a truck
    January 18, 2016
    Just how dangerous is it for a cyclist to draft a fast moving vehicle? Probably very dangerous but that means only some cyclists will attempt it, as these videos shows. At the start of this video from Brazil, the cyclist on the right appears to attach his Go Pro camera to the rear of the truck that they are drafting. It is not until about 3:55 seconds into the video that the speed picks up and reaches reportedly 124kph. Near the end of the video, the one cyclist left appears to take back the camera off t
  • VIDEO: Brazilian cyclists caught on camera drafting a truck
    January 18, 2016
    Just how dangerous is it for a cyclist to draft a fast moving vehicle? Probably very dangerous but that means only some cyclists will attempt it, as these videos shows. At the start of this video from Brazil, the cyclist on the right appears to attach his Go Pro camera to the rear of the truck that they are drafting. It is not until about 3:55 seconds into the video that the speed picks up and reaches reportedly 124kph. Near the end of the video, the one cyclist left appears to take back the camera off t