Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Master Mix 1000, music to asphalt ears
    April 17, 2012
    INTERMAT sees the world release of the Master Mix 1000 compact mobile asphalt plant by German manufacturer Benninghoven. The Master Mix 1000 is designed with smaller asphalt operations in mind. With the entire asphalt plant constructed on one chassis, customers can expect to be producing asphalt within a day of delivery. “Flexibility and transportability were the key design criteria,” said company spokesman Bernd Benninghoven.
  • European Day Without A Road Death: ‘Everyone’s vulnerable’
    September 25, 2019
    This year’s European Day Without A Road Death (Project EDWARD) takes place today, emphasising a theme of vulnerability. It is organised by the European Traffic Police Network (TISPOL), which offers a somewhat pessimistic view of the state of play. “We have spent time reflecting on recent results which paint a very mixed picture of progress in reducing deaths and serious injuries on Europe’s roads,” TISPOL says in a statement. “For the first few years of this decade, countries across the EU have been highly
  • New cost-saving Case CE midi-excavators
    January 6, 2017
    CNH Construction marketing director Jean-Patrick Yekpe has highlighted the money-saving potential of Case Construction Equipment’s new midi-excavators, unveiled at bauma 2013. The Tier 4 Final requirements of the CX75C SR and CX80C have been met, says Yekpe, through the use of cooled exhaust gas recirculation (CEGR) combined with a diesel oxidation catalyst system. “When the soot is coming out of the engine as smoke and touches the platinum inside the engine you get an oxidation, and as a consequence of thi
  • New cost-saving Case CE midi-excavators
    April 15, 2013
    CNH Construction marketing director Jean-Patrick Yekpe has highlighted the money-saving potential of Case Construction Equipment’s new midi-excavators, unveiled at bauma 2013. The Tier 4 Final requirements of the CX75C SR and CX80C have been met, says Yekpe, through the use of cooled exhaust gas recirculation (CEGR) combined with a diesel oxidation catalyst system. “When the soot is coming out of the engine as smoke and touches the platinum inside the engine you get an oxidation, and as a consequence of thi