Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Manitowoc releases lighter hoist rope for mobile cranes
    January 6, 2017
    Manitowoc has released the first synthetic hoist rope designed specifically for mobile cranes. The hoist rope is Grove’s new RT770E with KZ 100. It is a result of a joint development between Samson, a synthetic rope manufacturer, and Manitowoc. The hoist rope is 80% lighter than wire rope and features torque neutral construction that eliminates load spin and cabling. The new hoist material also makes for easy handling, reeving and installation as it reduces kinking, bird caging and damage from other t
  • Video: Romanian cycle paths up in the air
    October 10, 2016
    Either cycle paths in the southern Romanian city of Targu Jiu are too crowded or this unicyclist needed an adrenalin rush.

    Likely the latter, and daredevil Flaviu Cernescu, 33, got his fill as he pedalled around the 1m-wide crumbling rim of a disused industrial brick chimney stack. He is more than 250m up and manages to hop his unicycle over objects before deciding to hang by one hand into the black abyss of the chimney.

    Tiring of his unicycle, Cernescu decided to walk and juggle his way around the rim.
  • GCS Flex system is important introduction for Trimble
    January 6, 2017
    Roz Buick, vice president Heavy Civil Construction at Trimble, has highlighted some key technology introductions from the firm. The GCS Flex system is an important introduction for Trimble and Buick explained, “The idea is to install a less complex system. We want to attract customers from the smaller contractors.” Comparatively low cost for a machine-control system, the basic GCS Flex package offers entry-level 2D technology and it can be upgraded to what Buick calls a ‘2½D’ system.
  • GCS Flex system is important introduction for Trimble
    April 17, 2013
    Roz Buick, vice president Heavy Civil Construction at Trimble, has highlighted some key technology introductions from the firm. The GCS Flex system is an important introduction for Trimble and Buick explained, “The idea is to install a less complex system. We want to attract customers from the smaller contractors.” Comparatively low cost for a machine-control system, the basic GCS Flex package offers entry-level 2D technology and it can be upgraded to what Buick calls a ‘2½D’ system.