Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Manitou divisions Gehl and Mustang launch high capacity skid steer
    January 6, 2017
    Manitou Group’s two skid steer divisions, Gehl and Mustang, will launch versions of the same 1,815kg capacity skid steer at Bauma. The Gehl V400 and Mustang 4000V are said to be the world’s most powerful skid steers, with a vertical lift height of 3,647mm. The machines use a 74kW (99hp) engine and develop a 40.7kN breakout force.
  • Manitou divisions Gehl and Mustang launch high capacity skid steer
    February 8, 2013
    Manitou Group’s two skid steer divisions, Gehl and Mustang, will launch versions of the same 1,815kg capacity skid steer at Bauma. The Gehl V400 and Mustang 4000V are said to be the world’s most powerful skid steers, with a vertical lift height of 3,647mm. The machines use a 74kW (99hp) engine and develop a 40.7kN breakout force.
  • Slovakian bridge defies high explosives demolition attempt
    November 15, 2012
    An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction. The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.
  • US: Federal Highway Administration redistributes cash to states
    September 12, 2016
    The US state of California received the largest slice of US$2.83 billion of federal money redistributed for highway investment. California will get just over $293 million, New York will pick up nearly $156 million while Florida will get $150 million. Hawaii was the only state to receive nothing from the pot of unused highway funds. The $2.83 billion falls far short of the nearly $5.16 billion that the states requested to be redistributed, according to a Federal Highway Administration document. But the mone