Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • Italy at bauma 2013
    April 8, 2013
    Italian construction equipment manufacturers will be in abundance at bauma 2013, showcasing their impressive range of machines and technologies based on a rich and proud history of engineering excellence. The Munich-based show’s status as the largest construction equipment industry exhibition in the world represents the perfect platform for Italian firms to increase their customer base and enhance their global standing. The timing of bauma 2013, with all its associated trading and networking opportunities,
  • Delay to SF-Oakland Bay Bridge East Span opening and probe report
    July 9, 2013
    The Toll Bridge Program Oversight Committee (TBPOC) today said that the previously scheduled Labor Day (2 Sep) opening of the new East Span of the San Francisco-Oakland Bay Bridge has been postponed. News of the delayed opening was announced at the same time as TBPOC released its investigative report into the 32 bolts that broke on the Bay Bridge in March 2013, and its review of other bolts on the bridge. The contractor now forecasts that the steel saddle retrofit of the failed bolts on the east pier will b
  • Komatsu adds WA470 to its Dash-7 wheel loader range
    April 18, 2013
    Komatsu has unveiled its 23,590kg operating weight WA470-7 wheel loader, which offers improved efficiency, lower fuel consumption, improved operator comfort and enhanced serviceability. It is powered by a 203kW Stage IIIB/ EPA Tier 4I Komatsu SAA6D125E-6 engine, which is said to lower fuel consumption by 10% to 15% compared with the WA470-6. The engine is fitted with EGR, a hydraulically-actuated variable geometry turbocharger, and an automatically regenerating DPF. As with all Komatsu Stage IIIB machines,
  • JCB engine uses ‘mini-SCR’ to meet Tier 4 Final
    January 6, 2017
    JCB says its Ecomax Stage 4/Tier 4 Final engine can be engineered into many existing machines without needing additional space by using a ‘one can’ selective catalytic reduction (SCR). According to the company’s chief technology officer, Tim Burnhope, in many cases the mini SCR on the Stage 4/Tier 4 Final Ecomax engine can be positioned in the same space occupied by the exhaust silencer on previous generations. He said, “Our engine is already so clean that we only need 2% to 3% of urea, which allows us to u