Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • World Bank finances Uzbekistan road development
    July 7, 2015
    The World Bank will grant Uzbekistan a US$200 million loan for 25 years, including a grace period of five years. The funds will go towards the $240 million Regional Roads Development project that is scheduled to be completed by 2021, according to UzDaily.uz. Uzbekistan’s government also reported that around 117km roads were built in the first half of this year.
  • Bauma exhibit of model of Astec’s M-Pack asphalt facility
    February 28, 2013
    Astec, an Astec Industries company, and one of North America’s leading manufacturers of state-of-the-art asphalt plants, will exhibit as part of the Astec Industries stand. On display will be a one-eighth scale model of a complete Astec M-Pack relocatable asphalt facility. Since its debut at ConExpo 2005, the award-winning Astec model has garnered acclaim by putting an entire asphalt plant on a human scale with remarkable attention to detail. “The innovative M-Pack facility features the Astec exclusive Doub
  • Ricardo shows KERS for diggers at bauma 2013
    January 6, 2017
    Engineering firm Ricardo is part way through a research programme to develop an advanced energy recovery system that can be integrated into an excavator’s hydraulic system. Known as the High Efficiency Excavator (HFX) project, the system uses a 5kg carbon fibre flywheel that is encased in a vacuum-sealed cartridge, which contributes to minimising friction. The flywheel is spun at speeds of up to 30,000rpm using a magnetic coupling, which is driven from a hydraulic motor. Power for the hydraulic motor comes
  • Ricardo shows KERS for diggers at bauma 2013
    April 19, 2013
    Engineering firm Ricardo is part way through a research programme to develop an advanced energy recovery system that can be integrated into an excavator’s hydraulic system. Known as the High Efficiency Excavator (HFX) project, the system uses a 5kg carbon fibre flywheel that is encased in a vacuum-sealed cartridge, which contributes to minimising friction. The flywheel is spun at speeds of up to 30,000rpm using a magnetic coupling, which is driven from a hydraulic motor. Power for the hydraulic motor comes