Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • World debut for Ruthmann’s T 720 truck-mounted platform
    January 6, 2017
    The newest addition to Ruthmann’s Height series offers flexible access in awkward situations thanks to its extended telescoping upper boom with moveable jib. Ruthmann’s Steiger T 720 truck-mounted access platform made its world debut at bauma. The model has a working height of up to 72m and maximum lateral reach of 38m. Its design means that operators still have 21.4m reach at their disposal at a working height of 68m and with a 100kg cage load.
  • World debut for Ruthmann’s T 720 truck-mounted platform
    April 17, 2013
    The newest addition to Ruthmann’s Height series offers flexible access in awkward situations thanks to its extended telescoping upper boom with moveable jib. Ruthmann’s Steiger T 720 truck-mounted access platform made its world debut at bauma. The model has a working height of up to 72m and maximum lateral reach of 38m. Its design means that operators still have 21.4m reach at their disposal at a working height of 68m and with a 100kg cage load.
  • 3rd gala edition of Pilosio International Building the Peace Award at bauma
    January 6, 2017
    The construction industry’s social, contemporary and practical contribution to developing modern society and improving worldwide living conditions will be celebrated during bauma at the 3rd gala edition of the Pilosio International Building the Peace Award. The event, presented by renowned former CNN journalist Aleesio Vinci, will take place from 5pm on Wednesday April 17th 2013 at the Pilosio Stand (N 1020/1). The two previous editions in 2011 and 2012 drew guests from around the world from more than 20 c
  • 3rd gala edition of Pilosio International Building the Peace Award at bauma
    April 9, 2013
    The construction industry’s social, contemporary and practical contribution to developing modern society and improving worldwide living conditions will be celebrated during bauma at the 3rd gala edition of the Pilosio International Building the Peace Award. The event, presented by renowned former CNN journalist Aleesio Vinci, will take place from 5pm on Wednesday April 17th 2013 at the Pilosio Stand (N 1020/1). The two previous editions in 2011 and 2012 drew guests from around the world from more than 20 c