Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • 10 billion pixel camera offered by EarthCam.net
    January 6, 2017
    To say the GigapixelCam X10 is a high-powered camera is an understatement. The camera, unveiled by EarthCam.net at Conexpo 2014, is capable of taking 10 billion pixel, 360º panoramic images. “We help monitor, document and promote,” said Brian Cury, CEO and founder of the company. The monitoring comes in the form of live-streaming video that can bring the job site to a desktop. The documenting is achieved through archiving photos throughout the process, should a dispute surface.
  • David Quarmby will be a keynote speaker at ERIC 2016 in Leeds
    July 26, 2016
    David Quarmby, one of the United Kingdom’s most influential and experienced highways and transport senior executives, has been confirmed as a keynote speaker at the European Roads Infrastructure Congress – ERIC 2016 - in the autumn. Quarmby has had a long career in policy, planning, management and research in UK transport, with 39 years’ board-level experience in government, public agencies and the private sector, including London Transport and the retail food giant Sainsbury’s. Most recently he has b
  • Liebherr 150EC-B is latest flat-top crane
    February 7, 2013
    Liebherr will show a modular design flat-top tower crane in the 150EC-B at this year’s Bauma. The 150EC-B is available in FR.tronic, with traditional contractor controls, or Litronic version with programmable logic controls. The flat-top crane can be had in 6 tonne and 8 tonne versions, with a maximum hook height of 63m and maximum working radius of 60m. Lift capacity at full radius is 1,700kg.
  • Golden opportunity at AAPA 2015 International Flexible Pavements Conference
    August 19, 2015
    In just under four weeks, on Australia’s Gold Coast, the best minds in the global flexible pavement industry will gather for the Australian Asphalt Pavement Association’s 2015 International Flexible Pavements Conference. Experts will be presenting the most up-to-date technical information as well as real life examples of applied technology to projects, whether they be roads, tunnels, ports or airports. “This is a must-attend event for all in road construction and maintenance,” said Michael Caltabiano,