Skip to main content

VIDEO footage shows bridge replacement project in Rhode Island

A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. Rhode Island Department of Transportation (RIDOT) partnered with EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full constru
October 10, 2014 Read time: 2 mins
A time-lapse video has been released showing the rapid replacement of the Barton Corner Bridge in Rhode Island in the US. 3536 Rhode Island Department of Transportation (RIDOT) partnered with 7653 EarthCam to document the US$6.4 million rapid replacement of the Barton Corner Bridge. The construction project was completed during an 11-day period in August 2014 and can be seen in an exclusive time-lapse, released by RIDOT. Had RIDOT had used conventional methods, the bridge replacement would have taken two full construction seasons. By accelerating the construction process, the bridge was replaced in less than one month, saving money while eliminating traffic congestion.

The project was complex as the Barton Corner Bridge carries four lanes of I-95 plus two auxiliary lanes at a busy interchange with Route 2 on the Warwick/West Warwick line. Using accelerated bridge construction, RIDOOT built two halves of the bridge on land adjacent to the overpass, and then moved them into place. This enabled the new bridge to be constructed much faster compared with conventional construction methods, which would have taken twice the time. This approach also allowed RIDOT to do the work with no impact to Interstate traffic prior to installation.

EarthCam captured the innovative project from multiple angles by installing seven HD cameras in key locations.

Learn more about RIDOT and the Barton Corner Bridge replacement:

Time-Lapse: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.dot.ri.gov/news/barton_corner/video.php Visit http://www.dot.ri.gov/news/barton_corner/video.php false http://www.dot.ri.gov/news/barton_corner/video.php false false%>

Facebook: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.facebook.com/RIDOTNews Visit Facebook page false https://www.facebook.com/RIDOTNews false false%>

Twitter: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal twitter.com/RIDOTNews Visit Twitter page false https://twitter.com/RIDOTNews false false%>

YouTube: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.youtube.com/user/RIDOTwebmaster Visit RIDOT Youtube Page false https://www.youtube.com/user/RIDOTwebmaster false false%>

For more information on companies in this article

Related Content

  • HAZEMAG combines roller screen/feeder breaker
    February 13, 2013
    HAZEMAG has realised an intelligent, efficient, compact secondary crushing preparation plant with a minimised overall height for the production of 1,500tonnes/hour of lignite following an order last year from P.T Indonesia Pratama, Indonesia. It was the customer’s wish to get an intelligent crushing solution and a low overall height of the preparation plant. HAZEMAG combined a roller screen with the field-tested feeder breaker HFB 0714, thus offering screening and crushing in one unit, which has dimensions
  • Wacker Neuson adds to telehandler range
    January 6, 2017
    Wacker Neuson has added two compact telescopic handlers to its range – the TH412 and the TH625. The machines offer maximum heights of 4.31m and 5.73m respectively, with lift capacities of 1.2tonnes and 2.5tonnes. Despite their compact dimensions they retain large telescopic-handler design features, such as all-wheel steering and generously-sized cabs, standard on the TH625 and optional on the smaller model. The two loaders are equipped with Wacker’s VLS vertical lift system, which avoids overloading throug
  • Wacker Neuson adds to telehandler range
    April 19, 2013
    Wacker Neuson has added two compact telescopic handlers to its range – the TH412 and the TH625. The machines offer maximum heights of 4.31m and 5.73m respectively, with lift capacities of 1.2tonnes and 2.5tonnes. Despite their compact dimensions they retain large telescopic-handler design features, such as all-wheel steering and generously-sized cabs, standard on the TH625 and optional on the smaller model. The two loaders are equipped with Wacker’s VLS vertical lift system, which avoids overloading throug
  • New Zealand: 10-year plan sets out road infrastructure spending
    December 19, 2014
    New Zealand will spend US$30 billion over the next decade on public transport, including road works not just in major urban areas but in the provinces. The announcement was made by Transport Minister Simon Bridges after the government approved the draft Government Policy Paper 2015. The approved document takes into consideration concerns by local government that their transport infrastructure needs would be ignored in favour of those for large urban areas, the New Zealand Herald newspaper reported.