Skip to main content

VIDEO of explosive demolition for Missouri highway bridge

Watch the video of an explosive highway bridge demolition from the US. A demolition contractor recently removed an old highway bridge in Missouri using explosives. The bridge spanned Interstate 44 but had to be replaced as it no longer met requirements. Having been built in 1960, the bridge was 127mm (5”) too low to meet the current minimum height specification of 4.877m (16’) while it also required repairs to its deck that would have proven costly to implement. A new bridge will be built that meets the hei
August 18, 2014 Read time: 1 min

Watch the video of an explosive highway bridge demolition from the US. A demolition contractor recently removed an old highway bridge in Missouri using explosives. The bridge spanned Interstate 44 but had to be replaced as it no longer met requirements. Having been built in 1960, the bridge was 127mm (5”) too low to meet the current minimum height specification of 4.877m (16’) while it also required repairs to its deck that would have proven costly to implement. A new bridge will be built that meets the height requirements so as to allow sae passage of vehicles underneath. This new structure will also feature additional capacity with extra lanes as an expansion of a nearby industrial area is planned.

Related Content

  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Parsons wins bridge deal in Arkansas
    January 17, 2017
    Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction. The new bridge will be constructed some 61m upstream from the existing structure. The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.