Skip to main content

VIDEO of explosive demolition for Missouri highway bridge

Watch the video of an explosive highway bridge demolition from the US. A demolition contractor recently removed an old highway bridge in Missouri using explosives. The bridge spanned Interstate 44 but had to be replaced as it no longer met requirements. Having been built in 1960, the bridge was 127mm (5”) too low to meet the current minimum height specification of 4.877m (16’) while it also required repairs to its deck that would have proven costly to implement. A new bridge will be built that meets the hei
August 18, 2014 Read time: 1 min

Watch the video of an explosive highway bridge demolition from the US. A demolition contractor recently removed an old highway bridge in Missouri using explosives. The bridge spanned Interstate 44 but had to be replaced as it no longer met requirements. Having been built in 1960, the bridge was 127mm (5”) too low to meet the current minimum height specification of 4.877m (16’) while it also required repairs to its deck that would have proven costly to implement. A new bridge will be built that meets the height requirements so as to allow sae passage of vehicles underneath. This new structure will also feature additional capacity with extra lanes as an expansion of a nearby industrial area is planned.

Related Content

  • More on the Newmarket Viaduct replacement
    June 15, 2012
    When it was completed in 1965 – just six years after the Auckland Harbour Bridge – the six-lane Newmarket Viaduct with its tall, slender piers was something of an engineering wonder, the first of its kind in the Southern Hemisphere. Forty years on it had become a much-maligned contributor to Auckland’s chronic traffic congestion, too weak seismically to withstand the heaviest loaded trucks let alone a severe earthquake, so narrow in the shoulders that any accident stopped traffic flow and made it difficult
  • Concrete surface for runway paving job
    January 18, 2016
    The Fort Lauderdale-Hollywood International Airport in Broward County, Florida, was suffering departure delays on every single flight. The existing 9R-27L runway was too short at 1615m in length, affecting capacity at the airport. To deal with the issue, the Broward County Board of County Commissioners created a plan to extend the southern runway to 2438m to accommodate larger commercial aircraft. The project was not simple however and could not be achieved by tearing out the existing runway and buil
  • Effective, efficient long reach excavators
    April 13, 2012
    Long reach excavators now dominate the demolition sector - Mike Woof reports The last 10-15 years have seen the way demolition work is carried out change dramatically. Safety issues have long been of concern in the demolition sector, with the industry having been criticised for not doing enough to protect its workforce. Demolition projects can be dangerous due to the very nature of the job, with old structures being knocked down and broken up on-site. There is a substantial risk to site workers from
  • Effective, efficient long reach excavators
    February 15, 2012
    Long reach excavators now dominate the demolition sector - Mike Woof reports