Skip to main content

VIDEO of explosive demolition for Missouri highway bridge

Watch the video of an explosive highway bridge demolition from the US. A demolition contractor recently removed an old highway bridge in Missouri using explosives. The bridge spanned Interstate 44 but had to be replaced as it no longer met requirements. Having been built in 1960, the bridge was 127mm (5”) too low to meet the current minimum height specification of 4.877m (16’) while it also required repairs to its deck that would have proven costly to implement. A new bridge will be built that meets the hei
August 18, 2014 Read time: 1 min

Watch the video of an explosive highway bridge demolition from the US. A demolition contractor recently removed an old highway bridge in Missouri using explosives. The bridge spanned Interstate 44 but had to be replaced as it no longer met requirements. Having been built in 1960, the bridge was 127mm (5”) too low to meet the current minimum height specification of 4.877m (16’) while it also required repairs to its deck that would have proven costly to implement. A new bridge will be built that meets the height requirements so as to allow sae passage of vehicles underneath. This new structure will also feature additional capacity with extra lanes as an expansion of a nearby industrial area is planned.

Related Content

  • New Californian bridge
    February 7, 2012
    Plans are in hand for a new bridge to replace the Gerald Desmond Bridge at the Port of Long Beach in California. The existing structure is not able to cope with anticipated increases in vehicle traffic volumes and is also too low for new generation of cargo ships to pass underneath.
  • Demolition starts on Seattle’s Alaska Way Viaduct
    June 14, 2019
    Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
  • Asphalt milling optimised by 3D controls
    February 20, 2012
    3D machine controls can optimise milling efficiency, Mike Woof reports. More efficient milling and recycling operations can be carried out by using the latest 3D control systems on the market. At the last Trimble Dimensions event in Las Vegas, the advantages of 3D controls for milling operations proved a key topic. The use of 3D control systems can offer huge advantages in milling operations. This technology helps increase productivity as the milling machine will only remove what is required, which also hel
  • Terex built for bridge paving
    November 29, 2012
    To meet a need to carry out complex modern bridge designs, the Terex Bid-Well 3600 paver is available with truss transition inserts, increasing maximum paving width from 27.4-33.5m. The inserts adjust truss depth from 914-1219mm toward the paver’s centre, reducing frame deflection and this is said to increase surface profile smoothness. Offering paving widths from 4.6-33.5m with optional transition inserts, the 3600 gives companies more versatility for paving a wide variety of bridge designs, including mult