Skip to main content

VIDEO of explosive demolition for Missouri highway bridge

Watch the video of an explosive highway bridge demolition from the US. A demolition contractor recently removed an old highway bridge in Missouri using explosives. The bridge spanned Interstate 44 but had to be replaced as it no longer met requirements. Having been built in 1960, the bridge was 127mm (5”) too low to meet the current minimum height specification of 4.877m (16’) while it also required repairs to its deck that would have proven costly to implement. A new bridge will be built that meets the hei
August 18, 2014 Read time: 1 min

Watch the video of an explosive highway bridge demolition from the US. A demolition contractor recently removed an old highway bridge in Missouri using explosives. The bridge spanned Interstate 44 but had to be replaced as it no longer met requirements. Having been built in 1960, the bridge was 127mm (5”) too low to meet the current minimum height specification of 4.877m (16’) while it also required repairs to its deck that would have proven costly to implement. A new bridge will be built that meets the height requirements so as to allow sae passage of vehicles underneath. This new structure will also feature additional capacity with extra lanes as an expansion of a nearby industrial area is planned.

Related Content

  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • Using breakers to demolish redundant overpass
    December 11, 2015
    A demolition job in California was carried out successfully using a hydraulic breaker fitted to an excavator. An overpass on Highway 91 in Southern California had to be removed, with the contractor opting to use a hydraulic breaker for the job. The work was carried out within the 22-hour possession period set by the local authorities, allowing the route to reopen to traffic on time and minimising transport delays. The work was carried out safely and precisely, due to the use of suitable equipment. The re