Skip to main content

VIDEO captures unloved, unowned Reynolds Bridge reduced to rubble

There was a big bang in a small town in the US state of Pennsylvania this month when a fragmentation explosion brought down the 100-year-old Reynolds Road Bridge. It was the end to the unloved bridge near Factoryville, population around 1,500. Factoryville is notable for a lack of factories ever since the one and only plant, a wool-into-cloth factory, closed down several years after it opened in the 1800s. Local residents were not sorry to see the felling of the 40m long, reinforced concrete arch deck
May 18, 2015 Read time: 2 mins
There was a big bang in a small town in the US state of Pennsylvania this month when a fragmentation explosion brought down the 100-year-old Reynolds Road Bridge.

It was the end to the unloved bridge near Factoryville, population around 1,500. Factoryville is notable for a lack of factories ever since the one and only plant, a wool-into-cloth factory, closed down several years after it opened in the 1800s.

Local residents were not sorry to see the felling of the 40m long, reinforced concrete arch deck bridge over a Canadian Pacific Railway line. For three years the ugly bridge deep within the beautiful Endless Mountain region of north eastern Pennsylvania had been closed because it was crumbling, not just into disrepair, but literally disintegrating.

Metres and metres of rebar along the pedestrian way were laid bare where nature had eroded away concrete. Parts of the structure, named after one of the first settlers in the region, Captain Robert Reynolds, had fallen into the ravine below. Earlier this month the rest of the bridge very quickly followed, when implosion subcontractor CDI shrouded the bridge and ended 100 years of history, and some recent confusion.

The bridge fell into disrepair because it also fell into a legal crack – no person, agency, company or local authority would acknowledge ownership, leaving the bridge in limbo, according to local media. When the old railway company, whose rail lines ran underneath the structure, went bankrupt, the bridge reportedly was not sold off with other assets and this went unnoticed for years, until repairs became urgent in the past decade or so.

Demolition was paid for by the Canadian Pacific Railroad, who now owns the rail lines that were running underneath the demolished bridge, according to local TV station WNEP.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here Visit crumbling bridge demolished Page false http://wnep.com/2015/05/14/crumbling-bridge-demolished/ false false%> to see local media reports on the bridge’s condition just before demolition.

Related Content

  • Italy must embrace “internationalisation”
    January 6, 2017
    Italian construction equipment manufacturers are being urged to embrace “internationalisation” if they are to survive and prosper, after new figures revealed declining domestic but rising export sales in 2011.
  • Italy must embrace “internationalisation”
    February 16, 2012
    Italian construction equipment manufacturers are being urged to embrace “internationalisation” if they are to survive and prosper, after new figures revealed declining domestic but rising export sales in 2011.
  • ARTBA launching student video competition for 2015
    February 18, 2015
    The American Road & Transportation Builders Association (ARTBA) is running its annual student video competition. This is set up to challenge students of all ages to produce a two-to-four minute video about America’s transportation infrastructure. World Highways continues to support this competition and has also posted links to those videos from past winners and runners up on its websites in previous years. The ARTBA Student Video Competition is now in its fifth year. The aim of the competition is to raise a
  • PERI unveils VARIOKIT heavy-duty truss girder
    January 6, 2017
    PERI says that with new VARIOKIT system components it is now possible to create a heavy-duty truss girder for bridge construction. A supplement to the VARIOKIT heavy-duty shoring tower launched at bauma 2010, PERI said that during the new truss girder solution’s development it took into account load-bearing capacity of the tower and the challenging requirements of daily construction work. The modular lattice system can be used for spans up to 40m and is said by PERI to have a very high-load bearing capacity