Skip to main content

VIDEO captures unloved, unowned Reynolds Bridge reduced to rubble

There was a big bang in a small town in the US state of Pennsylvania this month when a fragmentation explosion brought down the 100-year-old Reynolds Road Bridge. It was the end to the unloved bridge near Factoryville, population around 1,500. Factoryville is notable for a lack of factories ever since the one and only plant, a wool-into-cloth factory, closed down several years after it opened in the 1800s. Local residents were not sorry to see the felling of the 40m long, reinforced concrete arch deck
May 18, 2015 Read time: 2 mins
There was a big bang in a small town in the US state of Pennsylvania this month when a fragmentation explosion brought down the 100-year-old Reynolds Road Bridge.

It was the end to the unloved bridge near Factoryville, population around 1,500. Factoryville is notable for a lack of factories ever since the one and only plant, a wool-into-cloth factory, closed down several years after it opened in the 1800s.

Local residents were not sorry to see the felling of the 40m long, reinforced concrete arch deck bridge over a Canadian Pacific Railway line. For three years the ugly bridge deep within the beautiful Endless Mountain region of north eastern Pennsylvania had been closed because it was crumbling, not just into disrepair, but literally disintegrating.

Metres and metres of rebar along the pedestrian way were laid bare where nature had eroded away concrete. Parts of the structure, named after one of the first settlers in the region, Captain Robert Reynolds, had fallen into the ravine below. Earlier this month the rest of the bridge very quickly followed, when implosion subcontractor CDI shrouded the bridge and ended 100 years of history, and some recent confusion.

The bridge fell into disrepair because it also fell into a legal crack – no person, agency, company or local authority would acknowledge ownership, leaving the bridge in limbo, according to local media. When the old railway company, whose rail lines ran underneath the structure, went bankrupt, the bridge reportedly was not sold off with other assets and this went unnoticed for years, until repairs became urgent in the past decade or so.

Demolition was paid for by the Canadian Pacific Railroad, who now owns the rail lines that were running underneath the demolished bridge, according to local TV station WNEP.

%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Click here Visit crumbling bridge demolished Page false http://wnep.com/2015/05/14/crumbling-bridge-demolished/ false false%> to see local media reports on the bridge’s condition just before demolition.

Related Content

  • VIDEO: London’s Silvertown Tunnel gets approval
    October 13, 2016
    A road tunnel costing €1 billion and a €111 million cycle and pedestrian bridge are among three infrastructure projects given the go-ahead by London’s mayor.

    The Silvertown Tunnel and the cycle and pedestrian bridge will link the Canary Wharf area north of the River Thames with Rotherhithe on the south bank.

    London mayor Sadiq Khan also approved an extension to the Docklands Light Railway that would run to Gallions Reach on the south bank of the Thames.
  • George Massey Tunnel Replacement gets environmental approval
    February 13, 2017
    The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.
  • VIDEO: Foran Equipment helps Kananaskis kayakers construct course
    April 27, 2016
    In the Canadian Rocky Mountains, there was a window of opportunity of only several days before these excavators had to be out of the Kananaskis River ahead of nearby Barrier Dam releasing its water. The provincial Alberta Whitewater Association hired local contractor Foran Equipment to bring in their equipment in to re-work the riverbed after severe flooding in June 2013 washed out the kayaking courses. Southern parts of Alberta province suffered severe storms and massive flooding that month which devastate
  • Slovakian bridge defies high explosives demolition attempt
    November 15, 2012
    An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction. The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.