Skip to main content

VIDEO: Balfour starts M3 bridge upgrade in UK following demolition

Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports. Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed Balfour Beatty is working for the agency Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day.
November 23, 2016 Read time: 2 mins
1146 Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports.

Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed

Balfour Beatty is working for the agency 8100 Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day. Once is it converted into a smart motorway and open in summer 2017, there will be an extra lane in both directions, increasing capacity by a third. Technology will be introduced to vary speed limits.

More than 250 engineers worked on the controlled demolition of Woodlands Lane Bridge which used a variety of methods to break up the structure and protect the carriageway beneath. This included installation of plywood protection, 150mm of timber mats and a further 600mm of crushed concrete.

Unfolding geotextile curtains contained dust and rubble as the bridge collapsed onto the protected area of the road below.

“The work went according to plan in spite of the poor weather conditions, safely, on time and the carriageway was reopened ahead of schedule,” said Stephen Tarr, managing director for major projects with Balfour Beatty.

For more information on companies in this article

Related Content

  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • Francis Scott Key Bridge demolition
    July 3, 2025
    Demolition is planned for the Francis Scott Key Bridge.
  • Balfour Beatty demolishes Scottish M8 bridge to create junction
    July 11, 2013
    Balfour Beatty has demolished a farm access bridge over the M8 motorway between junctions 4 and 5 to enable the completion of slip roads for the new Heartlands junction in West Lothian, Scotland. The demolition of Cowhill Bridge is a major milestone for Ecosse Regeneration in the construction of Junction 4a. Using ten excavators equipped with hydraulic breakers and munching attachments, the four span composite construction bridge was successfully removed during a recent 10-hour night time closure of the M8.
  • Balfour included on major UK Highways Agency framework contract
    November 7, 2014
    Balfour wins place on major UK Highways Agency road framework contract Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion). Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Del