Skip to main content

VIDEO: Balfour starts M3 bridge upgrade in UK following demolition

Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports. Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed Balfour Beatty is working for the agency Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day.
November 23, 2016 Read time: 2 mins
1146 Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports.

Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed

Balfour Beatty is working for the agency 8100 Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day. Once is it converted into a smart motorway and open in summer 2017, there will be an extra lane in both directions, increasing capacity by a third. Technology will be introduced to vary speed limits.

More than 250 engineers worked on the controlled demolition of Woodlands Lane Bridge which used a variety of methods to break up the structure and protect the carriageway beneath. This included installation of plywood protection, 150mm of timber mats and a further 600mm of crushed concrete.

Unfolding geotextile curtains contained dust and rubble as the bridge collapsed onto the protected area of the road below.

“The work went according to plan in spite of the poor weather conditions, safely, on time and the carriageway was reopened ahead of schedule,” said Stephen Tarr, managing director for major projects with Balfour Beatty.

For more information on companies in this article

Related Content

  • Skanska to start Black Cat upgrade
    November 30, 2023
    The A428 upgrade work in England was awarded in 2021 to create a 16km dual carriageway to improve journeys between Milton Keynes, Bedford and Cambridge, near London.
  • Portsmouth bridge gets cash boost
    December 17, 2012
    Major improvements are planned to tackle a traffic bottleneck on the Northern Road Bridge in Portsmouth, on the English south coast, after the government pledged €13.73 million [£11 million] for the project. The Department for Transport has given final approval to the scheme which will see work on a replacement bridge over the Portsmouth to London railway line at Cosham. The original bridge was built to carry a dual carriageway road but is now too weak to do so. Traffic has been restricted to a single lane
  • Smart UK motorway scheme
    February 19, 2014
    The first smart motorway scheme in the UK’s south-west has been officially launched, covering 11km of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and smooth t
  • Work to start on triple-deck roundabout in North Tyneside, UK
    June 30, 2016
    Construction of a major triple-deck roundabout in North Tyneside, England starts in August.

    The roundabout is part of an upgrade to the A19/A1058 Coast Road junction that includes lowering the A19 beneath the existing A1058 Coast Road and roundabout.

    The €90 million scheme is on the main route to and from the Tyne Tunnel and will mean that people travelling along the A19 will no longer have to queue at the roundabout to go continue their journey straight ahead. Instead, drivers will use a new section of road which will run under the junction.