Skip to main content

VIDEO: Balfour starts M3 bridge upgrade in UK following demolition

Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports. Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed Balfour Beatty is working for the agency Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day.
November 23, 2016 Read time: 2 mins
1146 Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports.

Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed

Balfour Beatty is working for the agency 8100 Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day. Once is it converted into a smart motorway and open in summer 2017, there will be an extra lane in both directions, increasing capacity by a third. Technology will be introduced to vary speed limits.

More than 250 engineers worked on the controlled demolition of Woodlands Lane Bridge which used a variety of methods to break up the structure and protect the carriageway beneath. This included installation of plywood protection, 150mm of timber mats and a further 600mm of crushed concrete.

Unfolding geotextile curtains contained dust and rubble as the bridge collapsed onto the protected area of the road below.

“The work went according to plan in spite of the poor weather conditions, safely, on time and the carriageway was reopened ahead of schedule,” said Stephen Tarr, managing director for major projects with Balfour Beatty.

For more information on companies in this article

Related Content

  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • 3D Repo develop virtual reality safety app for Balfour Beatty
    April 18, 2017
    3D Repo is working with contractors Balfour Beatty and Vinci and the UK roads agency Highways England to deploy a virtual reality simulation program for safety training. 3D Repo, a spin-off from University College London, develops open-source software for building information modelling in the cloud. More than 40 different 3D file formats are decomposed and federated in the company’s big data repository.
  • High speed bridge demolition minimises disruption
    February 16, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.