Skip to main content

Viaduct implosion during works ahead of 2016 Olympics in Rio de Janeiro, Brazil

A just released video shows the dramatic implosion of a Rio de Janeiro viaduct as part of the Brazilian city’s preparatory works for the 2016 Olympic Games. Fábio Bruno Construções (FBC), the company behind the blast, shot the seven-minute film in November 2013 to illustrate what happens behind the scenes on this kind of project. The film illustrates how FBC expertly used explosives to simply drop the viaduct down a level in a controlled and pre-determined manner.
January 22, 2014 Read time: 1 min
A just released video shows the dramatic implosion of a Rio de Janeiro viaduct as part of the Brazilian city’s preparatory works for the 2016 1558 Olympic Games.

Fábio Bruno Construções (FBC), the company behind the blast, shot the seven-minute film in November 2013 to illustrate what happens behind the scenes on this kind of project.

The film illustrates how FBC expertly used explosives to simply drop the viaduct down a level in a controlled and pre-determined manner.

For more information on companies in this article

Related Content

  • Demolition starts on Seattle’s Alaska Way Viaduct
    June 14, 2019
    Demolition of the Alaska Way Viaduct in the northwest US city of Seattle is underway, including the filling in of a redundant road tunnel.
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Brazilian business in Brumadinho benefiting from breaking
    June 10, 2015
    A Brazilian extraction operation is using a Rammer 3288 hydraulic hammer in a secondary breaking application The unit is helping maximise production at a facility in Brumadinho. The 2.04tonne hydraulic hammer is being used to increase the production of Itabirite at the FLAPA Mining site. Part of the Top Mix Group, the company operates in the heavy construction, dredging, mining, assembly and operation of processing and ore crushing plants. At the company’s Fábrica Mine, Jangada Mine, Capão Xavier Mine
  • Planned maintenance works will improve Mozambique roads
    July 8, 2013
    A programme of road maintenance and general upgrades will improve road links in Mozambique’s Tete Province. The scheme will see work worth around US$187 million carried out on some 700km of roads by Estradas do Zambeze. The company has a 30 year concession deal for the roads in Tete Province.