Skip to main content

Viaduct implosion during works ahead of 2016 Olympics in Rio de Janeiro, Brazil

A just released video shows the dramatic implosion of a Rio de Janeiro viaduct as part of the Brazilian city’s preparatory works for the 2016 Olympic Games. Fábio Bruno Construções (FBC), the company behind the blast, shot the seven-minute film in November 2013 to illustrate what happens behind the scenes on this kind of project. The film illustrates how FBC expertly used explosives to simply drop the viaduct down a level in a controlled and pre-determined manner.
January 22, 2014 Read time: 1 min
A just released video shows the dramatic implosion of a Rio de Janeiro viaduct as part of the Brazilian city’s preparatory works for the 2016 1558 Olympic Games.

Fábio Bruno Construções (FBC), the company behind the blast, shot the seven-minute film in November 2013 to illustrate what happens behind the scenes on this kind of project.

The film illustrates how FBC expertly used explosives to simply drop the viaduct down a level in a controlled and pre-determined manner.

For more information on companies in this article

Related Content

  • The Year in Infrastructure 2016 Conference Showcases China’s BIM Advancements
    November 15, 2016
    Unprecedented Scope and Diversity of Finalists and Awardees; CABRTech CEO Mr. Jiefeng Xu Addresses Building Forum LONDON – The Year in Infrastructure 2016 Conference – 1 November 2016 – Bentley Systems, Incorporated, a leading global provider of comprehensive software solutions for advancing infrastructure, today reported respects in which China sets the pace globally for BIM advancements. This year, the independent juries of the Be Inspired Awards selected nine Chinese projects among 54 finalists, an
  • Building Spain's highest viaduct
    July 9, 2012
    Amid a mountain wilderness, a new highway system rises, featuring Spain's highest viaduct For years, motorists and truck drivers in northern Spain have had to endure using a dangerous road liable to traffic hold-ups, delays and accidents, and frequently impassable in the depths of winter. In any event it is a slow and tortuous climb from Molledo on the Cantabrian lowlands up the N-611 road through the Cantabrian Mountains to Palencia, on the Meseta, Spain's high central plateau.
  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
  • Hydraulic breakers key to Hyderabad road project
    April 10, 2012
    The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city. It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority. Indian contractor Ramky Infrastructure is relying on an Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road. The rock is bein