Skip to main content

Venezuela bridge replacement project announced

Work to replace the Guanape Bridge in Venezuela is now commencing. The existing structure collapsed on the 24th January of this year, injuring eight people, but is too severely damaged to be rebuilt. The bridge was built in 2011 so its collapse has been the subject of some controversy. Building the new two lane structure will cost an estimated US$312 million and should be complete by the middle of 2017.
February 24, 2017 Read time: 1 min
Work to replace the Guanape Bridge in Venezuela is now commencing. The existing structure collapsed on the 24th January of this year, injuring eight people, but is too severely damaged to be rebuilt. The bridge was built in 2011 so its collapse has been the subject of some controversy. Building the new two lane structure will cost an estimated US$312 million and should be complete by the middle of 2017.

Related Content

  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • Mexico highway concession open for bids
    June 26, 2020
    A series of highway works are now open for bids in Mexico.
  • Doka formwork rises above the Orinoco River in Venezuela
    July 8, 2016
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood-plain, called for a new crossing of truly superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River, at Caicara del Orinoco, in Venezuela took shape with a formwork solution and automatic climbing technology from Doka. The bridge has an overall length of just over 11km and the main bridge is nearly 2.3km long with the roadway 55m above the river. The two ident
  • German bridge demolition work assisted by Liebherr
    May 9, 2022
    Construction equipment from Liebherr has played an important role in the project to demolish a bridge in Germany.