Skip to main content

Uzbekistan-Turkmenistan bridges opening

New bridge crossings over the Amu Darya River will improve transport connections between Uzbekistan and Turkmenistan. The bridges will open to traffic in early 2017 and will carry both motor vehicles and trains. The bridges have cost around US$123 million to construct. The new links have been needed for some time as existing crossings between the two countries have been insufficient and resulted in long delays. The river forms the border between the two countries for some distance.
December 1, 2016 Read time: 1 min
New bridge crossings over the Amu Darya River will improve transport connections between Uzbekistan and Turkmenistan. The bridges will open to traffic in early 2017 and will carry both motor vehicles and trains. The bridges have cost around US$123 million to construct. The new links have been needed for some time as existing crossings between the two countries have been insufficient and resulted in long delays. The river forms the border between the two countries for some distance.

Related Content

  • New bridge planned for Kenya’s port of Mombasa
    December 14, 2017
    Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete.
  • New road reduces Carlisle congestion by 20%
    May 11, 2012
    Carlisle, in north-west England, has seen as 20% reduction in congestion since the opening of the city’s US$284million (£176m) Northern Development Route in February this year. Around 10,000 vehicles a day are using the new road, which is broadly in line with the predictions made by highways engineers when building a case to construct a new route connecting the A595 with the M6 around the western flank of the city. Traffic counters positioned on the new road show an average of 9,583 vehicles a day along the
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • Inauguration of Mexico's Baluarte Bridge
    March 22, 2012
    Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world. Officials from the Guinness Book of Records presented an award to President Calderon, reflecting the Baluarte’s new status as it is higher than the previous holder, the Millau Brid