Skip to main content

Utah key highway connection project

Work is now complete for the second phase of the Mountain View Corridor project in the US state of Utah. The 4km greenfield roadway runs from 5400 South to 4100 South in West Valley City. The project was designed and built jointly by Michael Baker International, Ralph L Wadsworth and Staker Parsons. Phase two of the Mountain View Corridor project included 14 mainline bridges, as well as seven pedestrian bridges and intersection reconstruction, and vital safety improvements to accommodate growth in Salt Lake
February 23, 2018 Read time: 2 mins

Work is now complete for the second phase of the Mountain View Corridor project in the US state of Utah. The 4km greenfield roadway runs from 5400 South to 4100 South in West Valley City. The project was designed and built jointly by Michael Baker International, Ralph L Wadsworth and Staker Parsons.

Phase two of the Mountain View Corridor project included 14 mainline bridges, as well as seven pedestrian bridges and intersection reconstruction, and vital safety improvements to accommodate growth in Salt Lake County.

The next phase of construction is due to commence in 2019 and will widen the road connection from 4100 South to SR 201. In the meantime, the extension project into Utah County from SR-73 to 2100 North will begin in 2018. Once all phases are completed, the Mountain View Corridor will be a 56km freeway from I-80 in Salt Lake to SR-73 in Utah County. This will provide an alternative route to I-15 and improve transport for drivers.

Related Content

  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • East Africa’s massive new ring road project
    June 30, 2016
    Plans are being drawn up for a major new highway project in East Africa. Preparations are being made by the authorities in Kenya, Uganda and Tanzania. The 450km ring road route runs around the shoreline of Lake Victoria and will provide better transport connections for Kenya, Uganda and Tanzania, as well as for other near neighbours, particularly Rwanda and Burundi. New border posts will be required, to help increase the flow of traffic between the nations. Although it will be complex, the project will boos
  • $6.2 billion Newark Bay Bridge replacement
    July 9, 2025
    The $6.2 billion Newark Bay Bridge replacement project is moving ahead.
  • Acrow supplies temporary bridge during Turcot Interchange project
    June 28, 2018
    Acrow Bridge has supplied a long-term temporary modular bridge to main contractor KPH Turcot for its work on the Turcot Interchange reconstruction in Montréal, Canada. The 32.3m-long Turcot modular steel bridge - Acrow’s longest clear span bridge in Canada – is 5m wide and has an orthotropic deck. The rented Acrow components arrived on site late last year and the bridge was opened to traffic in December. It is expected to be in place for two years. The Turcot Interchange is a three-level stack freeway int