Skip to main content

Utah key highway connection project

Work is now complete for the second phase of the Mountain View Corridor project in the US state of Utah. The 4km greenfield roadway runs from 5400 South to 4100 South in West Valley City. The project was designed and built jointly by Michael Baker International, Ralph L Wadsworth and Staker Parsons. Phase two of the Mountain View Corridor project included 14 mainline bridges, as well as seven pedestrian bridges and intersection reconstruction, and vital safety improvements to accommodate growth in Salt Lake
February 23, 2018 Read time: 2 mins

Work is now complete for the second phase of the Mountain View Corridor project in the US state of Utah. The 4km greenfield roadway runs from 5400 South to 4100 South in West Valley City. The project was designed and built jointly by Michael Baker International, Ralph L Wadsworth and Staker Parsons.

Phase two of the Mountain View Corridor project included 14 mainline bridges, as well as seven pedestrian bridges and intersection reconstruction, and vital safety improvements to accommodate growth in Salt Lake County.

The next phase of construction is due to commence in 2019 and will widen the road connection from 4100 South to SR 201. In the meantime, the extension project into Utah County from SR-73 to 2100 North will begin in 2018. Once all phases are completed, the Mountain View Corridor will be a 56km freeway from I-80 in Salt Lake to SR-73 in Utah County. This will provide an alternative route to I-15 and improve transport for drivers.

Related Content

  • Ohio DOT road salt bids call falls on deaf ears
    February 17, 2014
    A request from the Ohio Department of Transportation (ODOT) in the US to provide road salt to local communities in need has received no bids from salt companies. ODOT asked salt companies to bid on 9,071tonnes increments of salt to be delivered to seven strategic locations during three rounds. The aim was to receive at least 136,077tonnes of road salt that ODOT could provide to local communities where some supplies are depleted. The agency planned to charge nothing for the road salt and instead was asking
  • Florida Turnpike improvements underway
    September 18, 2019
    A series of improvement works are being carried out in various parts of Florida, in a bid to improve traffic flow. Florida Department of Transportation (FDOT) is starting work to widen the 11km stretch of Florida Turnpike between Boynton Beach Boulevard and Lake Worth Road. This project will see the highway stretch being widened so that it boosts capacity, with the Hypoluxo Bridge also having to be rebuilt accordingly. The projected cost is US$168 million and the work is intended to cut congestion at peak
  • Cambodian connection – construction completion
    May 13, 2022
    Completion of the contract to construct a new Cambodian connection is coming soon.
  • Work underway for Brazil’s Santos-Guarujá Tunnel
    January 12, 2024
    Work is underway for Brazil’s Santos-Guarujá Port Tunnel project.