Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Vietnam's road improvements
    March 2, 2012
    The Asian Development Bank (ADB) is providing funding worth a total of US$210 million to the Vietnamese Government for infrastructure improvements.
  • Highway upgrades being planned for Vietnam’s Mekong Delta area
    August 12, 2019
    A series of highway upgrades will improve transport links in Vietnam’s Mekong Delta area. Improvements will be carried out to 52km stretch of the National Highway 53. The tender process is opening shortly for this road improvement contract, with the work expected to cost around US$51.4 million. Improvements are also being planned for the Quan Lo-Phung Hiep National Highway. This work should commence in late 2019 and should be complete in 2020. Upgrades are also planned for a stretch of the Dong Thap Pro
  • Vietnam expressway project feasibility study
    November 8, 2021
    A feasibility study will analyse a Vietnamese expressway project.
  • Vietnam plans major road expansion
    March 10, 2016
    Vietnam is working on plans for a major expansion of its expressway network. The plans call for a new network of expressways to be constructed by 2020. The programme of works calls for the construction of 21 new expressways, with a total distance of 6,411km. The new routes will connect major cities including Ho Chi Minh City, Da Nang, Ha Noi as well linking with Vietnam’s major seaports. The new routes also will also improve connections from Vietnam’s major cities to its key border crossings, main economic