Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • New road works for Ho Chi Minh City
    June 1, 2021
    New road works are planned for Vietnam’s Ho Chi Minh City.
  • South East Asia highway to connect Myanmar, Vietnam, Thailand, Laos
    November 18, 2015
    Plans are in hand in South East Asia for an improved road link connecting Vietnam, Thailand, Myanmar and Laos. A loan from the Asian Development Bank (ADB) worth US$100 million will help fund the work for the 66.4km section running between Kawkareik and Eindu in Myanmar. The highway will run for some 1,450km in all. The road will be called the East-West Economic Corridor and is of key importance to open up trade and transport between these nations. Talks for this project are underway at present.
  • A new expressway link for Vietnam
    November 11, 2019
    A new 225km expressway link in Vietnam will help boost connectivity between the Mekong Delta area in the south east of the country and Ha Tien Province. The project for the Ha Tien-Rach Gia-Bac Lieu expressway is expected to cost US$1.2 billion. The expressway will feature two lanes in either direction and will also connect with Vietnam’s National Highway 1A.
  • World Bank cancel US$1.2bn Padma Bridge loan
    July 6, 2012
    A loan worth US$1.20billion for the Padma Multipurpose Bridge project has been cancelled by the World Bank (WB). The decision was said to have been taken as the Bank was not satisfied with the actions taken by the Bangladeshi government in regards to corruption allegations involving the bridge contract. A major engineering and construction company is alleged to have made improper payments to Bangladeshi government officials in order to secure the bridge contract. The World Bank loan, signed In April last y