Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Vietnam’s highway network is expanding
    August 1, 2018
    Vietnam is expanding its road and highway network with a series of major projects, as well as numerous upgrades to rural roads. A funding deal worth US$1.6 billion is being provided by the Asian Development Bank (ADB) for the Ben Luc yo Long Thanh National Highway. This route connects Dong Nai, Ho Chi Minh City and Long An. A portion of the necessary funding for ground clearance for the route is being provided by Vietnam’s State Budget. However the country is stopping work on the National Highway 3 project
  • Sri Lanka's new highway - on track
    February 14, 2012
    Work is progressing on-track on Sri Lanka's Southern Expressway project. This will be the country's first expressway and is expected to be completed by 2012, removing the bulk of traffic from the existing coastal road that is highly congested and also has serious safety issues.
  • Vietnam’s new road works are being announced
    December 21, 2021
    Vietnam’s new road construction and improvement works are being announced.
  • Vietnam’s key highway project receiving initial funding
    November 15, 2018
    Funding from the World Bank will help with the development of Vietnam’s North-South Expressway project. The Vietnamese Government has sourced US$214 million for the project already from its own funds. The highway will stretch 654km across the country, speeding transport and helping develop trade and tourism. Because of the project’s scale, the work is being split into 11 separate stretches and should be complete by 2025.