Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Vietnam’s North-South highway plan
    October 19, 2016
    A new highway is being planned for Vietnam that will run from north-south and feature four traffic lanes, with two in either direction. The project has been put forward to the Vietnam Government by the country’s Ministry of Transport (MOT). The route of the highway has still to be revealed but the link would improve travel connections between capital Hanoi in the north of the country and Ho Chi Minh City in the south. Running for some 1,372km in all, the highway has an estimated cost of US$10.25 billion to
  • Boom in Asian infrastructure investment
    April 5, 2012
    Investment in China and India continues unabated, but other nations on the continent are eager to attract companies as Patrick Smith reports Asia is still booming despite the current economic crisis, and new infrastructure programmes are constantly coming on stream. Powerhouses China and India, with their double-digit growth figures and huge infrastructure plans (in scope and cost), are leading the way and are still magnets for businesses wishing to expand, both in terms of facilities and customers. But oth
  • Float positioning for Bandra Worli Bridges
    May 29, 2024
    In Mumbai, India, two steel bridges have been barged to site and then lifted into position as part of the Mumbai Coastal Road-Bandra Worli Sea Link project.
  • New US$353 million bridge for Hanoi, Vietnam
    February 7, 2024
    A new US$353 million bridge is planned for Hanoi, Vietnam.