Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Road development for Ho Chi Minh City in Vietnam
    August 26, 2015
    The authorities in Vietnam have set a massive budget for road development in Ho Chi Minh City. Some US$5.54 billion will be spent on improving the city’s road network. The projects included in the 2016-2020 road transport development plan include the construction of Belt Roads No3 and No4, the Ben Luc-Long Thanh Highway and tunnels at the Cong Hoa-Truong Chinh and An Suong intersections. The work also includes building flyovers at the Nguyen Huu Tho-Nguyen Van Linh Intersection, My Thuy Roundabout and Go Va
  • ADB extends US$252mn loan to fund road construction in five India states
    April 9, 2013
    Philippines-based Asian Development Bank (ADB) has agreed to loan the Indian government US$252 million for key road construction projects. The 25-year loan has a grace period of five years, a commitment charge of 0.15% per annum, and the interest rate will be determined on ADB’s LIBOR-based lending facility. The loan will be used to finance the construction of 3,461km of all-weather rural roads in West Bengal, Odisha, Madhya Pradesh, Chhattisgarh and Assam with the first phase scheduled to complete in Decem
  • New highway project underway in Vietnam
    July 23, 2014
    In Vietnam work is now underway on a major new highway that will connect Ho Chi Minh city, Long An and Dong Nai. This 57km highway is currently the biggest road project in Vietnam’s southern region. The four-lane highway will have a speed limit of 100km/h and the project is costing some US$1.6 billion. The project is due for completion in 2018.
  • Cambodia's road repair action plan
    February 24, 2012
    A newly planned project aims to address road maintenance issues in Cambodia.