Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Papua New Guinea is set for extensive road bridge work upgrades
    January 21, 2015
    Papua New Guinea is set to start road and bridge upgrades that could cost upwards of US$576 million. Work on bridges will be paid partly through agreements with the Australian Department of Foreign Affairs, amounting to around US$53 million, and the Asian Development Bank which is putting in nearly $32 million. The Australian Department of Foreign Affairs has also earmarked $101 million to upgrade of arterial roads to standard concrete in the port city of Lae, the capital of Morobe Province. Lae, the
  • Vietnam’s US$1.1 billion expressway stretch
    April 19, 2024
    New additions are planned for Vietnam’s US$1.1 billion expressway project.
  • Vietnam’s road programme gearing up
    January 7, 2019
    Vietnam’s impressive road development programme is now gearing up, with a series of major projects scheduled to commence in 2019. Work is starting on three key projects: the My Thuan 2 Bridge; the Cam Lo to La Son highway section; the Cao Bo to Mai Son highway section. All three of these projects will form part of the Eastern North-South Expressway, with the work being overseen by the Ministry of Transport (MOT). The My Thuan 2 Bridge will cost some US$214.3 million and will connect Vinh Long Province with
  • Vietnam-Laos expressway under consideration
    October 11, 2021
    A new expressway linking Vietnam and Laos is under consideration.