Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Funding programme for Sri Lankan rural roads
    November 21, 2019
    A new funding package has been agreed to help pay for Sri Lanka’s rural road development programme.
  • UK equipment exports and imports continue upwards trend
    August 24, 2017
    UK exports of construction and earthmoving equipment continued its upward trend in Q2 of 2017, showing growth for the fourth consecutive quarter. Overall, Q2 2017 levels were the highest for two years, since Q2 2015, according to the latest quarterly report from the UK’s CEA – Construction Equipment Association. Exports in Q2 2017, increased by 5.3% in weight terms (tonnage of machines) compared with Q1 2017 and 2% in monetary terms, reaching nearly €777 million (£714 million).
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • A major highway project is moving forward in New Zealand
    June 28, 2012
    Plans are moving ahead for New Zealand's Transmission Gully highway project. The country’s Environmental Protection Agency has given its final approval for the construction of the 27km Transmission Gully project, which is expected to cost in the region of US$732.4 million (NZ$930 million). The project will be the largest road deal in Wellington region since the late 1970s and one of the largest infrastructure projects in New Zealand.