Skip to main content

US$410mn ADB loan to build second Vietnam Southern Highway

The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
August 14, 2013 Read time: 2 mins
The 943 Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong 199 Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access.

The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between the Vam Cong ferry and the Cao Lanh ferry station is expected to be reduced by an hour.

Meanwhile, the 35.4km distance between Long Xuyen and Cao Lanh is expected to be cut to 29km. Construction of the two bridges is set to be launched in September 2013, and the highway and bridges, which will create 400,000 construction and manufacturing jobs, are projected to begin operation by late 2017.

Moreover, the work is projected to cost $860 million, with $260 million to be contributed by the 1290 Export-Import Bank of South Korea, $56 million from the 983 Vietnamese Government, and $143.4 million from the 3200 Australian Agency for International Development.

Related Content

  • Highway developments to boost east-west transport
    February 16, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports
  • Progress on Vietnam US$2bn transport infrastructure projects
    July 17, 2012
    Two major transport infrastructure projects in Vietnam with a combined value of more than US$2billion are a step closer to completion. A tender to appoint a contractor for the US$1.47billion Danang-Quang Ngai highway development has been published by Vietnam Expressway Corp (VEC).
  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.
  • Completion date for stretches of Vietnam’s key project
    October 25, 2018
    The completion date has been announced for sections of Vietnam’s key road project. The North-South Expressway project is being built in eight stretches with the work being handled under the PPP model. Vietnam’s transport ministry is aiming for sections of the route to be built by the second quarter of 2020. Funding worth US$5.09 billion has been secured for the project. The North-South Expressway forms a key part in Vietnam’s national road strategy. The plan also includes upgrading, improving and maintaini