Skip to main content

US$177mn to build Bolivia’s Caracollo-Confital road, vice-president states

The construction of a 74km road between Caracollo and Confital in Bolivia will cost around US$177 million, the country’s vice-president Alvaro Garcia Linera has revealed. The contract for the project has been put out to tender. Companies have until 8 November 2013 to submit their proposals. The contract will be signed on 23 December 2013.
September 24, 2013 Read time: 1 min
The construction of a 74km road between Caracollo and Confital in Bolivia will cost around US$177 million, the country’s vice-president Alvaro Garcia Linera has revealed.

The contract for the project has been put out to tender. Companies have until 8 November 2013 to submit their proposals. The contract will be signed on 23 December 2013.

Related Content

  • Final Lower Thames Crossing approval awaited
    November 7, 2022
    Work in the UK includes a twin bore tunnel under the River Thames east of London.
  • Tanzania’s work on East Africa’s multi-national road project
    November 28, 2022
    Tanzania is kick-starting construction work on the missing link in East Africa's multinational road
  • Uganda highway project attracting strong bidder interest
    September 6, 2018
    Strong interest is being seen for the project to build Uganda’s new Kampala-Jinja Expressway. So far eight bids have been submitted for the project, which is expected to cost around US$985 million to build. The tender for the project should be awarded in December 2019. So far the bidders include the Austrian contractor Strabag, the Chinese contractor China Communications Construction Company (CCCC) and the Indian contractor Shapoorji Pallonji Group. The bids are being managed by the Uganda National Roads Au
  • STRABAG wins tricky Polish project
    May 2, 2012
    Austrian construction firm STRABAG has won a major road contract from Poland’s General Directorate for National Roads and Highways (GDDKiA). The deal is for the construction of a 40km section of the S8 Expressway between Walichnowy and Sieradz Poùudnie, some 240km to the south west of capital Warsaw.