Skip to main content

US$177mn to build Bolivia’s Caracollo-Confital road, vice-president states

The construction of a 74km road between Caracollo and Confital in Bolivia will cost around US$177 million, the country’s vice-president Alvaro Garcia Linera has revealed. The contract for the project has been put out to tender. Companies have until 8 November 2013 to submit their proposals. The contract will be signed on 23 December 2013.
September 24, 2013 Read time: 1 min
The construction of a 74km road between Caracollo and Confital in Bolivia will cost around US$177 million, the country’s vice-president Alvaro Garcia Linera has revealed.

The contract for the project has been put out to tender. Companies have until 8 November 2013 to submit their proposals. The contract will be signed on 23 December 2013.

Related Content

  • Italian motorway operator signs US$3.86 billion satellite toll contract in France
    May 1, 2012
    Italian motorway operator Autostrade per l'Italia (ASPI) signed the US$3.86 billion contract awarded earlier on in 2011 for the heavy vehicle satellite toll system of the motorway network in France.ASPI leads a consortium also including French telecom group SFR with a six per cent stake, defence group Thales with 11 per cent, IT specialist Steria with three per cent, and transport firm SNCF with 10 per cent.
  • The drive for US road funding: will corporate America get a seat?
    September 13, 2017
    Trumponomics aims to use public money for pump-priming an even greater amount of cash from the private sector to improve America’s crumbling roads. But is political will matching corporate America’s enthusiasm for more private investment, asks David Arminas If there were ever a test case for comparing public-private partnerships and design-build contracts, the recently completed Ohio River Bridges Project is it (see previous article).
  • Brazil’s budget cuts threaten the Santos-Guaruja immersed tunnel
    August 18, 2015
    Adjustments to Brazil's budget could pose a threat to the planned immersed tunnel between Santos and Guaruja in Sao Paulo state, local media reported.

    Sao Paulo state had put the project out to tender and had verbal support from the national treasury to borrow up to US$2 billion to finance the project. However, because of the economic crisis, this support has not materialised.

    The tunnel would by 1.7km long, carry six lanes of traffic and be at an estimated depth of 35m.
  • Caterpillar France’s Eric Lepine takes over CECE presidency
    January 15, 2014
    Eric Lepine, general manager of Caterpillar France SAS in Grenoble, has taken over the presidency of the Committee for European Construction Equipment (CECE). Lepine replaced Johann Sailer on January 1 2014 and will serve as CECE president over the next two years. The official handover from Sailer, who himself chaired the association for two years, took place in Paris in December on the occasion of the last CECE-Steering Group meeting of the year. During his 26 years of experience in the industry, Lepin