Skip to main content

US$177mn to build Bolivia’s Caracollo-Confital road, vice-president states

The construction of a 74km road between Caracollo and Confital in Bolivia will cost around US$177 million, the country’s vice-president Alvaro Garcia Linera has revealed. The contract for the project has been put out to tender. Companies have until 8 November 2013 to submit their proposals. The contract will be signed on 23 December 2013.
September 24, 2013 Read time: 1 min
The construction of a 74km road between Caracollo and Confital in Bolivia will cost around US$177 million, the country’s vice-president Alvaro Garcia Linera has revealed.

The contract for the project has been put out to tender. Companies have until 8 November 2013 to submit their proposals. The contract will be signed on 23 December 2013.

Related Content

  • New road projects will commence in Bolivia
    June 8, 2012
    Several key new road links will be built in Bolivia following the investment of US$150 million by the country’s road authority, Administradora Boliviana de Carreteras (ABC). The construction work will centre on Chuquisaca with work planned on some 302km of new roads. The work will include the 46.5km Sucre-Ravelo stretch, which is expected to cost $30 million, while work on the 68km Zudanez-Padilla road is expected to cost over $30 million.
  • ERIC 2016: What shape the ‘Smart Road’?
    February 7, 2017
    Optimism about the future of highways worldwide abounded at the inaugural European Road Infrastructure Conference (ERIC) in Leeds, UK Around 500 delegates passed through the varied sessions during the three-day event at the Royal Armouries Museum in the northern English city of Leeds. They came away with many visions of what a motorway and road could look like. But what speakers at the event - co-organised by the Brussels-based European Union Road Federation (ERF) and the UK’s Road Safety Markings Ass
  • Denmark concerned over rising cost of Fehmarn Belt Fixed Link
    February 19, 2015
    The Danish government is in talks with contractors over the latest rise in cost estimates for the proposed prestigious Fehmarn Belt Fixed Link between Denmark and Germany. Contractors have estimated an extra €295.5 million will be needed. This is in addition to a statement last November by the contracting company Femern saying that costs had risen nearly €900 million. The total rise price hike is nearly €1.2 billion. This puts the final cost of the 18km tunnel including two railway tunnels, two motorway tun
  • Mexico-Puebla highway second level build from early 2014
    May 3, 2013
    Construction of Mexico-Puebla highway’s second level will start in early 2014, according to the head of the Communications and Transport Ministry, Gerardo Ruiz Esparza. Meanwhile, the Secretariat of Communications and Transport in Mexico has opened an international tender process for the construction of the Siglo XXI road in the Morelos state. Those interested in taking part in the process have until 12 June 2013 to buy the tender's terms and conditions. The new contract involves the construction, operation