Skip to main content

US land sale completed for US-Canada Gordie Howe Bridge

Detroit has reached an agreement with the state to sell land, assets and some streets as part of a second bridge between Windsor and Detroit.
June 27, 2017 Read time: 2 mins
RSS

Detroit has reached an agreement with the state to sell land, assets and some streets as part of a second bridge between Windsor and Detroit.

A report by the Detroit News said that the $US48 million will go towards neighbourhood programmes, job training and health monitoring.

Of this, around $26 million will go to relocating residents in Detroit’s Delray district whose properties will be affected by construction and positioning of the Gordie Howe International Bridge.

The bridge will provide a second road link between the Canadian city of Windsor in the province of Ontario and Detroit, in the US state of Michigan. The vast majority of commercial trucking between the US and Canada uses the only city-to-city crossing, the aging Ambassador Bridge owned by the American Manuel “Matty” Moroun.

Construction of the new $2.1 billion bridge should start in 2018 for completion in 2020. Canada is supplying Michigan’s $550 million share of the bridge, which will be repaid through tolls.

Detroit News said that the deal calls for the city to sell the 2630 Michigan Department of Transportation 36 parcels of land, underground assets and about 8km of streets in the bridge’s footprint.

Canada has already completed a major access road, the Herb Gray Parkway, on the Canadian side.

The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility relocations on the Canadian side of the river, noted the Windsor-Detroit Bridge Authority, a not-for-profit Canadian government corporation. The WDBA is managing the procurement for design, construction, financing, operation and maintenance of the bridge through a public-private partnership for which the WDBA is also responsible for project oversight.

For more information on companies in this article

Related Content

  • Checking up on the Czech Republic's Via Salis
    May 20, 2022
    Construction of the Via Salis, the Czech Republic’s first public-private partnership for a road project, is on schedule, according to VINCI which is leading the construction and operating consortium.
  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Parsons wins 407 Transitway contract around the Toronto area in Canada
    August 21, 2015
    Parsons has been selected by the Canadian province of Ontario to provide environmental assessment planning and preliminary design for the next section of the 407 Transitway. Work will include 23km of bus rapid transit lanes, from west of Hurontario Street to east of Highway 400, as well as 11 transit stations, all around the provincial capital Toronto area. The project is part of the 150km cross-regional rapid transit corridor planned to parallel Highway 407 Express Toll Route freeway, a 107km control
  • Ho Chi Minh City pushes ahead with Thu Thiêm Bridge 4 project
    April 18, 2017
    Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project. The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review. In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investmen