Skip to main content

US land sale completed for US-Canada Gordie Howe Bridge

Detroit has reached an agreement with the state to sell land, assets and some streets as part of a second bridge between Windsor and Detroit.
June 27, 2017 Read time: 2 mins
RSS

Detroit has reached an agreement with the state to sell land, assets and some streets as part of a second bridge between Windsor and Detroit.

A report by the Detroit News said that the $US48 million will go towards neighbourhood programmes, job training and health monitoring.

Of this, around $26 million will go to relocating residents in Detroit’s Delray district whose properties will be affected by construction and positioning of the Gordie Howe International Bridge.

The bridge will provide a second road link between the Canadian city of Windsor in the province of Ontario and Detroit, in the US state of Michigan. The vast majority of commercial trucking between the US and Canada uses the only city-to-city crossing, the aging Ambassador Bridge owned by the American Manuel “Matty” Moroun.

Construction of the new $2.1 billion bridge should start in 2018 for completion in 2020. Canada is supplying Michigan’s $550 million share of the bridge, which will be repaid through tolls.

Detroit News said that the deal calls for the city to sell the 2630 Michigan Department of Transportation 36 parcels of land, underground assets and about 8km of streets in the bridge’s footprint.

Canada has already completed a major access road, the Herb Gray Parkway, on the Canadian side.

The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility relocations on the Canadian side of the river, noted the Windsor-Detroit Bridge Authority, a not-for-profit Canadian government corporation. The WDBA is managing the procurement for design, construction, financing, operation and maintenance of the bridge through a public-private partnership for which the WDBA is also responsible for project oversight.

For more information on companies in this article

Related Content

  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • A virtual virtuous circle
    January 18, 2021
    Virtual sensors will allow a safer driving experience and reduce road maintenance costs. Tactile Mobility’s Eitan Grosbard talks to David Arminas
  • Texas highway project tackles congestion
    April 10, 2012
    A new highway project in Texas will tackle peak congestion
  • Vietnam ponders PPP for Ring Road 4 work in Ho Chi Minh City area
    April 24, 2019
    A 36km segment of 197km Ring Road 4 project in the Long An Province could cost as much as US$300 million, according to a prefeasibility study. The segment runs from Ben Luc rural district to Hiep Phuoc Port in the Ho Chi Minh urban area, as noted in the study prepared by Cuu Long Corporation. The government is considering offering the work as a public-private partnership. The road would feature 10 bridges and an overpass at an intersection with National Highway 1. If approved, work could start i