Skip to main content

US land sale completed for US-Canada Gordie Howe Bridge

Detroit has reached an agreement with the state to sell land, assets and some streets as part of a second bridge between Windsor and Detroit.
June 27, 2017 Read time: 2 mins
RSS

Detroit has reached an agreement with the state to sell land, assets and some streets as part of a second bridge between Windsor and Detroit.

A report by the Detroit News said that the $US48 million will go towards neighbourhood programmes, job training and health monitoring.

Of this, around $26 million will go to relocating residents in Detroit’s Delray district whose properties will be affected by construction and positioning of the Gordie Howe International Bridge.

The bridge will provide a second road link between the Canadian city of Windsor in the province of Ontario and Detroit, in the US state of Michigan. The vast majority of commercial trucking between the US and Canada uses the only city-to-city crossing, the aging Ambassador Bridge owned by the American Manuel “Matty” Moroun.

Construction of the new $2.1 billion bridge should start in 2018 for completion in 2020. Canada is supplying Michigan’s $550 million share of the bridge, which will be repaid through tolls.

Detroit News said that the deal calls for the city to sell the 2630 Michigan Department of Transportation 36 parcels of land, underground assets and about 8km of streets in the bridge’s footprint.

Canada has already completed a major access road, the Herb Gray Parkway, on the Canadian side.

The first phase of early works has focused on fill placement, construction of a perimeter access road and minor utility relocations on the Canadian side of the river, noted the Windsor-Detroit Bridge Authority, a not-for-profit Canadian government corporation. The WDBA is managing the procurement for design, construction, financing, operation and maintenance of the bridge through a public-private partnership for which the WDBA is also responsible for project oversight.

For more information on companies in this article

Related Content

  • AEC’s Model 6048 Bridge Deck Finisher in demand in Canada
    June 24, 2013
    Allen Engineering Corporation (AEC) recently delivered a Model 6048 Bridge Deck Finisher to PCR Contractors to be used on the 11km-long Rt. Hon. Herb Gray Parkway project in Canada. The US$1.4 billion highway infrastructure project is under construction in the Ontario municipalities of Windsor, LaSalle and Tecumseh. The Rt. Hon. Herb Gray Parkway will carry car and truck traffic from Hwy 401 in Canada to a new crossing across the Detroit River to I-75 in Michigan. The works will improve traffic flow at Cana
  • Aecon sells Ontario road business to GIP
    May 18, 2023
    Canadian infrastructure group Aecon has sold its Ontario-based construction and aggregates business Aecon Transportation East to Green Infrastructure Partners.
  • Detroit-Windsor Tunnel crossing gets new customs facilities
    February 17, 2015
    The governments of Canada and the province of Ontario officially opened a new customs plaza at the Windsor-Detroit Tunnel, one of the busiest road crossings between the United States and Canada. The Canadian federal government provided US$8 and the province added $20 million for the project that is part of security improvements and to speed up people processing facilities on the Canadian side of the tunnel. Among the upgrades are new vehicle access lanes, new buildings for the Canada Border Services Agency
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.