Skip to main content

Urgent repairs to Forth Rd bridge

Urgent repairs will continue on the Forth Road Bridge in east central Scotland this weekend after work the previous weekend was disrupted by strong winds. The bridge authority has also confirmed that a further three weekends of traffic restrictions will be required over the following weeks. On Saturday 17 and Sunday 18 March traffic will be restricted to a single lane in each direction from 3am until 12noon.
March 19, 2012 Read time: 3 mins
Urgent repairs will continue on the Forth Road Bridge in east central Scotland this weekend after work the previous weekend was disrupted by strong winds.

The bridge authority has also confirmed that a further three weekends of traffic restrictions will be required over the following weeks.

On Saturday 17 and Sunday 18 March traffic will be restricted to a single lane in each direction from 3am until 12noon.

Pedestrians and cyclists will be able to cross the bridge using the west footpath/cycleway.

Traffic restrictions may be extended into the afternoon if bad weather delays the repairs. If work cannot be completed over the weekend, restrictions will be in place from 9am until 4pm on the next available weekday.

Weekend traffic restrictions will also be required on Saturday 31 March and Sunday 1 April, and on two further weekends after Easter on dates to be confirmed.

Officials at the 4069 Forth Estuary Transport Authority (FETA), who run the Forth Road Bridge, are working closely with colleagues from 4068 Transport Scotland, emergency services and nearby local authorities to co-ordinate these works with traffic management for the Forth Replacement Crossing project and minimise the impact on the travelling public. This includes the restrictions on the M90 that are due to begin on 9 April.

Barry Colford, chief engineer and bridgemaster, said: “Stronger winds than forecast meant we did not make the progress that we hoped for over the weekend. At height on the cable the wind was gusting at over 45mph and this made it unsafe to lift materials and personnel.

“Further investigations have also now established that additional work is going to be necessary over the next few weeks.

“Four weekends in total will be required. This weekend’s work is the most critical and needs to be completed at the earliest opportunity. We will then need another weekend to remove the access cradle headworks and a further two weekends to carry out repairs on another part of the cable.”

Colford said the repair team will attempt to minimise disruption but stressed that significant delays are inevitable. He said any failure to complete the repairs could lead to “far more disruptive and costly repairs” at a future date.

“The majority of the repair works will be carried out overnight or without the need for traffic restrictions, however daylight and a carriageway closure are necessary for us to safely provide access to the main cable,” said Colford.

For more information on companies in this article

Related Content

  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
  • Amey chooses polystyrene blocks for Scottish tunnel infill
    June 25, 2018
    Amey recently completed an infill project to make safe a disused railway tunnel underneath the approach roads north of Scotland’s Forth Road Bridge. The 420m tunnel was part of the Dunfermline to North Queensferry railway line that provided a link to the ferry service until the opening of the Forth Bridge in 1890. The 4.3m-wide and 5.1m-high tunnel with vaulted roof and brick lining continued in use for freight until 1954. The tunnel runs underneath the A9000 and B981 on the northern approach to the Forth
  • SWARCO completes installation on UK’s busiest north east highways
    March 22, 2017
    SWARCO has installed a network of 27 variable message signs at some of the busiest highway locations in the northern UK’s Tyneside region. The signs give motorists key information to help them plan their journey and warn them of weather disruption and other potential hazards. Planning and coordinating all works with each local authority was the major challenge, requiring some of the installations to be made in the dead of night. The city of Newcastle was the contracting local authority acting for the Nor
  • Vital structures
    February 10, 2012
    A wide variety of products are available to help bridge owners reduce the need for costly repairs. Bridges are one of the most expensive structures on a highway system, and their maintenance, and where necessary, repair will save millions over time. Prevention being better than cure means that anything that can be done to reduce the need for repair is a good investment. For example, a MOOG bucket-type inspection unit has been commissioned for the Naini Bridge in Allahabad in the state of Uttar Pradesh, Indi