Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • Qatar starts work on the state’s longest cable stayed bridge
    April 23, 2019
    Qatar has started construction of a 1.2km cable-stayed bridge that will be the longest in the Gulf state. The bridge will have 20 pylons and 16 piers to reach the highest point of 30m. It is part of the Sabah Al-Ahmad Corridor project, according to the Public Works Authority of Qatar (Ashgal). With four lanes in each direction, the bridge will accommodate more than 16,000 vehicles a hour, according to Ashghal engineer Abdullah al-Naiemi. Comnpletion is set for early 2021. Meahwhile, the Haloul Int
  • Heavyweight Warrior is a big presence at INTERMAT
    January 6, 2017
    The Warrior 2400 is the largest machine in Powerscreen’s Warrior range and is designed for large-scale operators in the quarrying and mining sectors. It is capable of handling larger feed sizes and has an output potential of up to 800tonnes per hour. It features a heavy-duty incline screen with a high amplitude triple shaft drive mechanism, lending it to screening, scalping, two or three-way splitting and stockpiling materials like aggregates, topsoil, coal, construction, demolition waste and iron ore.
  • Heavyweight Warrior is a big presence at INTERMAT
    April 17, 2012
    The Warrior 2400 is the largest machine in Powerscreen’s Warrior range and is designed for large-scale operators in the quarrying and mining sectors. It is capable of handling larger feed sizes and has an output potential of up to 800tonnes per hour. It features a heavy-duty incline screen with a high amplitude triple shaft drive mechanism, lending it to screening, scalping, two or three-way splitting and stockpiling materials like aggregates, topsoil, coal, construction, demolition waste and iron ore.