Skip to main content

Upgrade set to start of Budapest’s Széchenyi Chain Bridge

Budapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media. Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019. The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow B
April 4, 2017 Read time: 2 mins
RSSBudapest’s iconic Széchenyi Chain Bridge that was opened in 1849 is set for a €73 million upgrade starting this summer, according to Hungarian media.

Work will include revamping of a nearby tunnel in the Hungarian capital with completion set for the end of 2019.

The suspension Chain Bridge spans the River Danube between Buda and Pest and was designed by English engineer William Tierney Clark following an initiative by the Count István Széchenyi. It is a larger scale version of Clark's earlier Marlow Bridge, across the River Thames in Marlow, near London. Its 202m centre span was one of the longest in the world when bridge was opened.

It was designed in sections and shipped from the United Kingdom for assemble in Budapest. The two-lane deck is nearly 15m wide and the iron chains on which the road-deck hangs are supported by two 48m river piers in classicist style. The bridge was rebuilt in the late 1940s after being blown up by the retreating German army in early 1945.

Related Content

  • MPA pro-active on cyclist safety
    July 18, 2014
    The MPA (Mineral Products Association) and its members have been taking significant action on a key recommendation in the UK House of Commons Transport Committee Cycling Safety report relating to Heavy Goods Vehicles (HGVs), published today. One of the Committee’s recommendations (16) calls on the freight industry to “create a culture of safety among HGVs” and requests “the establishment of a timetable for the development of an industry-wide code of conduct”. In support of this, MPA had already launched
  • MPA pro-active on cyclist safety
    July 18, 2014
    The MPA (Mineral Products Association) and its members have been taking significant action on a key recommendation in the UK House of Commons Transport Committee Cycling Safety report relating to Heavy Goods Vehicles (HGVs), published today. One of the Committee’s recommendations (16) calls on the freight industry to “create a culture of safety among HGVs” and requests “the establishment of a timetable for the development of an industry-wide code of conduct”. In support of this, MPA had already launched
  • Fehmarnbelt hearings to start
    September 24, 2020
    The Danish-German project has come under financial and environmental criticism.
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.